BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Wilmington, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The CLI WILMINGTON CROSSINGS FY23 project is comprised of construction of seven pedestrian crosswalk improvements throughout the City of Wilmington. The project includes improved signage and markings, ADA-compliant upgrades, sidewalks, and traffic calming measures. The locations are: Truesdell Street at Holmes Elementary School and Piedmont Street, Locust Street mid-block crossing at City Municipal Building, N. South Street Mid-block crossing north of Birdsall Street, Nelson Avenue at Luther E Warren Peace Path Trail, S. South Street mid-block crossing south of Sugartree Street, Mulberry Street at Luther E. Warren Peace Path Trail, and Thorne Avenue midblock crossing at Wilmington High School Athletic Complex. The work covered by this completion guarantee shall include only those items listed for comparison of bids. The contractor hereby agrees that the said owner shall be and is hereby authorized to deduct and retain out of the moneys which may be due or become due to the said contractor, under this agreement, as damages for the noncompletion of the work aforesaid within the time hereinbefore stipulated for its completion or within such further time as in accordance with the provision of this agreement shall be fixed or allowed for such performances or completion, the sum of $500 per day for each and every day the time employed upon said work may exceed the time stipulated for its completion, or such stipulated time as the same may be increased, as hereinbefore provided, which said sum of $500 per day is hereby, in view of the difficulty of estimating such carnages, agreed upon, fixed and determined by the parties hereto as the liquidated damages that the owner will suffer by reason of such default and not by way of penalty.

Bid Results

Sidewalks / Parking Lot

$662,591.00

Public - City

Paving, Site Work

33

5

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
54
Bidding Soon
1,347
All Active Projects
613
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2023

October 9, 2023

img_map_placeholder

Multiple Locations, Wilmington, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.