BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2023 at 8:00 PM

Updated January 27, 2024

Site work for a bridge / tunnel in Cheyenne, Wyoming. Completed plans call for site work for a bridge / tunnel.

The work is described in the plans, specifications and on the Bid schedule, and consists of the placement of RCP, headwalls, and grading for a culvert under an unpaved roadway northwest of Cheyenne, WY. Additional work will consist of raising the profile of the existing roadway for approximately 450' to accommodate the new culvert to obtain proper cover and meet AASHTO requirements. All construction will take place within the existing right-of-way and is within a Zone A floodplain. Question Deadline 09/01/2023 at 12:00 PM MT

Bid Results

Bridges / Tunnels

$290,525.00

Public - County

Site Work

36

6

9

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
37
Bidding Soon
501
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2023

October 9, 2023

Project location map

Telephone Rd, Cheyenne, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.