BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a water / sewer project in College Station, Texas. Completed plans call for the construction of a 4,032-square-foot, one-story above grade water / sewer project; for site work for a water / sewer project; and for paving for a water / sewer project.

As of May 9, 2024, the awarded construction manager has released this project for final pricing. LOCATION AND DESCRIPTION OF PROJECT The new Bryan Texas Utilities Backup Control Center is to be constructed at 21325 Kathy Fleming Rd., College Station, TX. The scope of work for the BTU Control Center - Millican will be for the following trades and will include but not limited to: CAST-IN-PLACE CONCRETE, CONCRETE BLOCKING OR ANCHORAGE, CAVITY WALL UNIT MASONRY, COLD FORMED METAL FRAMING, METAL FABRICATIONS, ROUGH CARPENTRY, FINISH CARPENTRY AND MILLWORK, ARCHITECTURAL WOOD CASEWORK, FLUID-APPLIED WATERPROOFING, THERMAL INSULATION, FLUID-APPLIED MEMBRANE AIR BARRIERS - DOW, POLYVINYL-CHLORIDE FLEECEBACK ROOFING, ROOF RELATED SHEET METAL, JOINT SEALANTS, EXPANSION CONTROL, HOLLOW METAL DOORS AND FRAMES, PLASTIC LAMINATE FACED WOOD DOORS, GYPSUM WALLBOARD SYSTEMS, PORCELAIN TILE, ACOUSTICAL LAY-IN CEILING, RESILIENT FLOORING, PAINTING AND STAINING, INTERIOR PAINTING, TOILET ROOM ACCESSORIES, FIRE EXTINGUISHER AND CABINETS, PLUMBING, COMMISSIONING OF PLUMBING, HEATING, VENTILATING, AND AIR-CONDITIONING, COMMISSIONING OF HVAC, ELECTRICAL, COMMISSIONING OF ELECTRICAL SYSTEMS, STRUCTURED CABLING SYSTEM, DATA CABLING, FIRE DETECTION AND ALARM, EARTHWORK, TERMITE CONTROL, PAVEMENT MARKINGS, CHAIN LINK FENCES AND GATES, LANDSCAPING, HYDRO MULCH SEEDING, and other related trades. CONSTRUCTION BUDGET: BTU has established Three Million and No /100 Dollars ($3,000,000.00) as the estimated construction budget for all the Work including alternates as described in the Drawings, Technical Specifications, and other Contract Documents prepared by the Architect. CONTRACT TIME: The times for Substantial Completion and Final Completion are set forth in the Construction Agreement (Attachment 2). By submission of a Proposal, each Offeror represents and warrants to BTU that such Completion dates are reasonable, and that Offeror is fully capable of completing construction of the Project by such Completion dates. Although a firm timeline has not been confirmed, construction is not expected to start prior to Summer 2024. Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. The supplier/ subcontractor agree to direct all correspondence to the Contractor only, and agree that no correspondence will be directed either written or verbal to the Owner or Architect. All supplier/ subcontractor correspondence will go through Collier Construction. Subcontractor shall not contact the Owner, Architect or Engineers for any reason without prior written consent from Collier construction. Collier and the Subcontractor agree that the primary and principal materials to be furnished and the primary and principal work to be done by the Subcontractor are as set forth in and contemplated by the described portions of the Drawings and Specifications or other documents and/or descriptions as set forth on EXHIBIT "A", entitled SCOPE OF WORK, said exhibit, inclusive of all its terms and conditions being hereby incorporated herein and made a part of this Subcontract for all intents and purposes.

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

New Construction, Paving, Site Work

1

1

18

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
224
Bidding Soon
4,701
All Active Projects
1,848
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 16, 2024

July 15, 2024

img_map_placeholder

21325 Kathy Fleming Rd, College Station, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.