BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in San Bernardino, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and transportation facility.

As of October 3, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Liquidated Damages 4,800 Per Calendar Day of Delay Online Q&A Yes Q&A Deadline 09/05/2023 4:00 PM (PDT) The project will provide pedestrian and bicyle improvements near five (5) Metrolink stations as noted below: City of Montclair Metrolink Station Pacific Electric (PE) Trailhead signage for existing restrooms. City of Upland Metrolink Station Provide pedestrian automated crossing gares at Euclid Avenue and A Street. Provide enhanced crosswalks at nine intersetions alogn 1st Avenue, 2nd Avenue and 3rd Avenue. PE Trail pedestrian path between Euclid Avenue and Campus Avenue. Pedestrian/bicycle priority signal at PE Trail and Campus Avenue. City of Rancho Cucamonga Metrolink Station Provide Cycle Track (Protected Calss IV Bike Lane) along 6th Street between Haven Avenue and Rochester Avenue. City of Fontana Metrolink Station Provide missing sidewalk alogn Wheeler Avenue, Newport Avenue, Emerald Avenue, and Ceres Avenue East of Sierra Avenue (including four curb ramps). Provide buffered bike lanes, wayfinding signage, Color bike trail at conflict zones alogn Arrow Boulevard and Citrus Avenue. City of San Bernardino Metrolink Station Provide bike lanes from end of Mt Vernon Viaduct Project to Ramona-Alessandro Elementary School on the North to the Santa Fe Depot on the South.

Bid Results

Roads / Highways

$6,877,000.00

Public - County

Paving, Site Work

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
469
Active Projects
226
Bidding Soon
3,599
All Active Projects
1,617
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 22, 2023

November 2, 2023

April 17, 2024

img_map_placeholder

Multiple Locations, San Bernardino, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.