BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Fresno, California. Completed plans call for the construction of a 85,000-square-foot educational facility; and for site work for a educational facility.

Liquidated Damages $10,000 Construction Phase Start/Delivery Date Preconstruction 11-09-23; Construction 1-17-25 Project Duration Preconstruction phase 244 calendar days; Construction phase 450 calendar days License Requirements B The State of California acting through the Board of Trustees of the California State University, hereinafter called the Trustees, on behalf of California State University, Fresno, hereinafter called University, are seeking proposals from pre-qualified construction managers (Proposers) to provide construction management services with a guaranteed maximum price for the construction of the Project referenced above, hereinafter called the Project. The selected Proposer will become the Construction Manager (CM). The delivery method for this Project is Construction Manager at Risk (CMAR), which consists of a preconstruction phase and a construction phase with separate contracts for each phase. During the preconstruction phase, the CM will collaborate with the Architect on the design, constructability, cost and schedule of the Project and develop a Guaranteed Maximum Price (GMP) proposal to construct the Project. Upon the Trustees acceptance of the GMP, the Trustees may issue a contract to the CM for the construction phase. If the Trustees and the CM do not agree upon a GMP, the Trustees will not award the construction phase of the Project to the CM. This project is a public works project. The Project generally consists of: an approximate 85,000 gross square foot student housing facility. This project will be located west of the existing residence halls at the southwest corner of the main campus, in proximity to the Shaw and Cedar Avenue intersection. This is the first new construction for Fresno State Housing since the late 1960s. This project will provide 175 apartment-style bed spaces which will help to meet the demand for affordable student housing. The project also includes units for students with children. Common spaces include meeting rooms, lounges, study spaces, recreation rooms, and laundry facilities. The site development includes a sustainable landscape plan with outdoor program areas including secured bike/scooter storage, and an accessible playground area. The project site will impact the existing Housing parking lot (Lot 27), with this loss of approximately 200 stalls (805 net remaining stalls). This project would be designed to meet the equivalent of Leadership in Energy and Environmental Design (LEED) Platinum certification and would, at a minimum, comply with Title 24 Building, Energy and Green Buildings Standards. The new building would include new stand-along, HVAC systems. Exterior lighting would adhere to LEED-New Construction (NC) guidelines for light pollution reduction and energy efficiency. Interior Project lighting would be all light-emitting diodes. The Project would include rooftop solar panels to offset 50% of the Projects energy consumption. CSU Point of Contact for Information: Brian Cotham; bcotham@csufresno.edu When it nears time to bid trades, the selected construction manager shall contact the Trustees' DVBE Coordinator, Brian Cotham, 559-278-2111 or bcotham@csufresno.edu.. Last day to submit RFP questions/ Friday, September 8, 2023

Award

Educational

$35,000,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
42
Bidding Soon
679
All Active Projects
320
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 22, 2023

January 17, 2025

img_map_placeholder

Multiple Locations, Fresno, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.