BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Newburyport, Massachusetts. Completed plans call for site work for a water / sewer project.

The Contractor shall furnish all labor, materials, equipment, bonds and insurance necessary to perform all work required for the project known as Lower Artichoke Reservoir Dam Spillway Protection Project - Contract # 24-02, in strict accordance with the Contract Documents and all related Drawings and Specifications. The said Documents, Specifications, Drawings and any supplemental general conditions are incorporated herein by reference and are made a part of this Agreement. All questions regarding the bid/contract documents, including but not limited to a request for interpretation of such documents, must be sent by e-mail addressed to Tom Watkins, Business Manager, at twatkins@cityofnewburyport.com and to be given consideration must be received by 5:00 PM, Thursday September 7, 2023. This project generally consists of the following Installation of City-furnished trap rock at the upstream face of the spillway to the contours shown to create a foundation to support large sand bags for flood protection in the event of a major storm. The total amount of stone needed for the entire Project has been estimated at 1,900 tons and this amount has been delivered to the Project site. The City will furnish additional stone if and as necessary to complete the project. The Project also includes: clearing of vegetation and topsoil removal; construction of vehicular access ramps using the City-furnished trap rock and supplemented with smaller crushed stone furnished by the Contractor, if and as directed by the City, to improve the ramps surface for the movement of heavy equipment; furnishing and installing fill material, loam, and seed to repair an eroded portion of the earthen dam crest adjacent to the spillway; furnishing, installing, and removing a temporary turbidity curtain upstream and downstream of the spillway; compliance with all permit conditions as provided in the Contract Documents; and all incidentals. Plans/Specification Available beginning 8/23/23 @ 10:00 A.M. Lower Artichoke Reservoir Dam Spillway Protection.

Award

Water / Sewer

$188,445.00

Public - City

Site Work

12

13

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
194
Bidding Soon
3,180
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2023

November 14, 2023

Project location map

To Be Determined, Newburyport, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.