BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a civil project in Texas City, Texas. Completed plans call for the renovation of a water / sewer project.

Pump, Motor, & VFD for Water Treatment Plant; Piping for IPS; Install Pump & Motor for Water Treatment Plant & IPS. 26.8460.805.00.5758, 22W09010 3.1 Work at the Clearwell Pump Station (Facility 10) at the Thomas Mackey Water Treatment Plant includes: Furnish and install Clear Well Pump 552 and all appurtenances complete in place. Furnish and install all piping, appurtenances, and coatings to connect pump to distribution system, complete in place. Supply two (2) Variable Frequency Drives (VFDs). See "Variable Frequency Drives Supply Proposal for Clearwell Pump Station", included in Appendix C. Install two (2) VFDs with housekeeping pads and mounting, complete in place. Furnish, install and terminate all electrical instruments, conduit, and wiring to connect pumps and VFDs to the electrical system, complete in place. 3.2 Work at the Industrial Pump Station (Facility 20) includes: Transport four (4) Owner-Furnished pumps and motors from the Mackey Water Treatment Plant to Standard Alloys Incorporated (SAI). One (1) Owner-furnished pump is already stored at SAI. Transport five (5) Owner-Furnished pumps and motors from SAI to the Industrial Pump Station site. Install five (5) Owner-Furnished pumps and motors, complete with all appurtenances. Furnish and install all piping, piping modifications, appurtenances, and coatings. Conduct four (4) pump and motor inspections, stuffing box modifications, complete with all appurtenances. See "Pump and Motor Inspection Proposal for Industrial Pump Station", included in Appendix D. Furnish, install, and terminate all electrical conduit and wiring to connect pump motors to the electrical system. 3.3 Work at the IPS Screening Area (Facility 21) Furnish and install piping, fittings, valves, instruments, appurtenances, FRP plate, control panels, conduit, and wiring to connect screening area improvements to electrical system, complete in place. Question Deadline 09/12/2023 at 5:00 PM CT Construct the Work in phases during the construction period; coordinate construction schedule and operations with the Authority. B. For Clearwell Pump Station, see Drawing 10-X101 for Demolition notes and Drawing 10-W501 for sequence of pump installation. See Drawing 10-E101 for VFD Installation Sequence. C. For Industrial Pump Station, see Drawings 20-I100 through 20-I105 for phasing. D. For CPS Motorized Valve (Bid Alternate), see Drawing 11-P101 for requirements. For all questions, legal, purchasing, technical and schedule please contact: Name: John Martinez Title: Project Manager Phone: 409-682-0869 Email: jmartinez@gcwatx.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$2,300,000.00

Public - State/Provincial

Renovation

45

27

6

9

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
314
Active Projects
208
Bidding Soon
3,949
All Active Projects
1,604
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 17, 2023

December 11, 2023

May 4, 2025

img_map_placeholder

Multiple Locations, Texas City, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.