Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work for a mixed-use development in Saskatoon, Saskatchewan. Conceptual plans call for site work for a sidewalk / parking lot; and road / highway.

Scope of work may include construction of approx. 11 kilometers of new shared-use pathway locations throughout the City, adjacent to the Circle Drive: 1. Calder Crescent to Wilson Crescent: 2.2 km 2. Delaronde Road to Kingsmere Boulevard: 2.5 km 3. Taylor Street to 8th Street: 1.15 km 4. 8th Street to 14th Street: 0.75 km 5. Central Avenue to 108th Street: 1.3 km 6. Lanyon Avenue to Rail Bridge: 0.2 km 7. Avenue W to Glenwood Avenue: 1 km 8. Mackie Crescent (lane) to Marlborough Crescent (lane): 1 km 9. Milton Street to Laurier Drive: 0.2 km 10. 20th Street to 17th Street: 0.5 km TIMELINE: Projects are conceptual. Timelines for detailed design and construction are subject to capital funding approvals. Individual projects will be reported in the future, once they have been approved to proceed with design or construction. Coverage of this report is discontinued.

Project Abandoned

Sidewalks / Parking Lot

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
19
Bidding Soon
243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2025

Project location map

Circle Dr, Saskatoon, SK


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed