BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Gibson, Georgia. Completed plans call for site work for a road / highway.

Question Deadline 09/12/2023 All questions concerning the project shall be addressed in writing to John Solomon at john.solomon@oneatlas.com 1. All work, if included in the Contractors Scope of Work, shall be performed in accordance with the Georgia Department of Transportation Standard Specifications, Section 611. 2. The following procedure shall be used in the adjustment of the structures: a) It shall be the Contractors responsibility to note and mark the location of each water valve box and manhole covers on the streets to be resurfaced, prior to the resurfacing work then locate and adjust each of these after resurfacing. b) Structures, both manholes and water valves, shall be adjusted within 30 days after the road is resurfaced. Failure to do so will result in the assessment of Liquidated Damages in the amount of twenty-five dollars ($25.00) per calendar day per structure for every day beyond this 30-day requirement. c) The existing pavement will be removed a minimum of 9 outside the most exterior points of the structures. d) Structures will be adjusted to pavement grade using bricks, shims or other nonorganic material. e) Concrete having a minimum compressive strength of 3000 p.s.i. at 28 days shall be placed around the adjusted structure, consolidated to fill the voids, and finished to pavement grade. Care should be taken to prevent concrete from falling into manholes, with any such material being removed by the contractor as soon as possible. f) Concrete shall be protected from traffic for a minimum of 3 days with steel plates, or other measures as approved by the Engineer. g) The unit prices bid for Manhole Adjustment and/or Water Valve Box Adjustment will be for all work performed, including excavation and disposal of existing material, adjustment of structure, traffic control, and protection of the concrete. 2023 LMIG Resurfacing

Post-Bid

Roads / Highways

$300,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
21
Bidding Soon
504
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2023

October 23, 2023

img_map_placeholder

Multiple Locations, Gibson, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.