Published November 28, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Highland, Indiana. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: The project includes but is not limited to: The construction of approximately 5,080 linear feet of sanitary sewer ranging from eighteen (18) to sixty (60) inches in diameter via open-cut construction methods. Improvements also include the construction of new manhole structures and the connecting of the proposed sewer to the existing N. 5 th Street Lift Station, as required for a complete and functioning wastewater collection system. In addition, the project also includes approximately 1,440 linear feet of water main relocation ranging from six (6) to eight (8) inches in diameter via open-cut construction methods. All ancillary work, site demolition, and site restoration shall be provided as required by the Contract Documents. Bids will be received for a single prime Contract. Bids shall be as shown in the Bid Form. Obtaining the Bidding Documents The Issuing Offices for the Bidding Documents are Commonwealth Engineers, Inc., 9604 Coldwater Road, Suite 203, Fort Wayne, IN 46825 and Commonwealth Engineers, Inc., 19 N. Court Street, Crown Point, IN 46307. Prospective Bidders may examine the Bidding Documents at the Issuing Offices on Mondays through Fridays between the hours of 8:00 a.m. to 5:00 p.m. local time, and may obtain copies of the Bidding Documents as described below. Prospective Bidders may also examine the drawings via the Web-based service of Commonwealth Engineers, Inc. at www.commonwealthengineers.com Bidding Documents also may be examined at Highland Municipal Building, 3333 Ridge Road, Highland, IN 46322, on Mondays through Fridays between the hours of 8:30 a.m. to 4:30 p.m. local time. Contract Documents will not be sold separate from the web-based service (i.e. All plan holders will be required to purchase through the web-based service). Partial sets of Contract Documents, Specifications and Drawings are not available. Questions pertaining to this project shall be submitted directly to Brian Wilson, P.E. at Commonwealth Engineers, Inc. via online portal . Additional questions concerning access to the website may be directed to Commonwealth Engineers, Inc. at (317) 888-1177. Requests for Contract Documents and Specifications and Drawings must also include a return street address; post office box numbers are not acceptable. All addenda, which may be issued for this Project, will be issued to each plan holder via email. For those whom also purchase printed Contract Documents, printed addenda will be provided as well. All plan holders shall note, the printed documents are provided as a courtesy and do not preclude the plan holder from relying upon the web/email-based materials (i.e. delays in mail delivery will not be considered relevant due to all contract document holders access to materials via web/email). No refunds will be issued for this project. The OWNER reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. NO bid may be withdrawn after the scheduled closing time for receipt of bids for at least 60 days. Bid security shall be furnished in accordance with the Instructions to Bidders.

Award

Water / Sewer

$11,619,169.00

Public - City

Site Work

67

22

26

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Structural Aluminum Framing, Metal Decking, Metal Fabrications, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, Air Duct Accessories, Flexible Connectors, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Pruning, Watering, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Machining Equipment, Boring Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
75
Bidding Soon
2,089
All Active Projects
873
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2023

December 1, 2023

img_map_placeholder

Multiple Locations, Highland, IN


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Sanitary Sewer Overflow Remedial Project Phase 1 - Division A

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.