Site work for a water / sewer project in Atherton, California. Conceptual plans call for site work for a water / sewer project.

In FY 2013-14, the City Council approved an update the Town’s Drainage Master Plan. The Master Plan identified Tier 1 projects, those with the highest need based on improving safety, reducing flooding, and mitigating environmental degradation as all being in the upper reach of the Atherton Channel. Projects that are identified as the Town’s responsibility will be assessed for deficiencies. Funding in the first year of the CIP is proposed for engineering and surveying to identify areas of responsibility, followed by design of high-priority improvements, and required environmental permitting. This process typically takes a year or more to complete. Future years include funding for project construction but are merely placeholder amounts for fiscal planning. This program also includes the implementation of a Green Infrastructure Plan and as otherwise required by the Municipal Regional Stormwater Permit issued by the Regional Water Quality Control Board. Green infrastructure improvements would include: required stormwater treatment measures associated with the Selby Lane Bicycle Lanes Project, roadway improvements, and potentially on Lloyden Drive (at Fair Oaks) and on Polhemus Avenue as identified in the Green Infrastructure Master Plan. Projects Not Budgeted but Planned for Future Years o Task 1C: Replacement of failed culverts; Euclid, Polhemus, Camino al Lago, Stockbridge and Carolina, Serrano, and Shearer intersection regrades, install new swales and berms. o Task 2: Relining side slopes and bottom of Atherton Channel downstream of Alameda de las Pulgas. Project is included in the Town of Atherton's FY 2023-2027 Capital Improvement Plan (CIP). As of November 17, 2023, information regarding a design team or a general contractor is not available. Funding is anticipated from 2023 to 2027.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$4,150,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
77
Bidding Soon
1,542
All Active Projects
669
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

img_map_placeholder

Multiple Locations, Atherton, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.