BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 9, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a road / highway in Stoughton, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Location: Stoughton Intersection Improvements and Related Work at Central Street, Canton Street and Tosca Drive District: 5 Project Number: 608279 Federal Aid No: STP-0035(054)0 Project Type: Traffic Signals, Highway - Construction MADOT - Intersection Improvements and Related Work at Central Street Labor participation goals for this Project shall be 15.3% for minorities and 6.9% for women for each job category. The goals are applicable to both Contractor's and Subcontractor's on-site construction workforce. Refer to Document 00820 for details. The work under this contract consists of tree removal, excavation, full depth construction, pavement standard milling, paving, concrete sidewalks and pedestrian curb ramps, HMA driveways, removing and resetting granite curb and installing new granite curbing, drainage, new wall construction, providing and spreading loam borrow and seed, installation of traffic signal equipment, traffic signing and pavement markings, traffic control management and other street improvements.

Award

Roads / Highways

$3,900,192.00

Public - State/Provincial

Paving, Site Work

133

5

4

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
521
Active Projects
196
Bidding Soon
4,031
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2023

December 4, 2023

Project location map

Central St, Stoughton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.