Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2025 at 8:00 PM
Updated August 23, 2025
Site work for a water / sewer project in Harrisonburg, Virginia. Conceptual plans call for site work for a water / sewer project.
Update: Harrisonburg Public Utilities formats its Capital Improvement Program (CIP) to provide funding for two applications: 1. Capital Rehabilitation and Retirement (R&R): R&R is the retirement of existing assets at an optimum time near the end of their life cycle but with opportunity to avoid ancillary financial, social or environment burden. The HPU CIP process uses asset retirement date forecasts made from known installation dates and from Manufacturer's Anticipated Service Life (MASL). The CIP process provides Future Asset Replacement Cost (FARC) by inflating the Current Asset Replacement Cost (CARV) by two-andone-half percent annually to the retirement date. 2. Capital Expansion (Expansion): Expansion is the addition of new assets with the purpose of expanding service, capacity, functionality or strategy of operations. NOTE: Because rates cannot be adjusted annually to meet the schedule of fluctuating costs, HPU determines the sum and the uniform funding that is required throughout the immediate upcoming 25 years period. The latter is the Annual Cost of Sustainable Service Operation (ACSO) and is used for funding and expense scheduling. Adjustments are made when rates will not support the ACSO or when expenses are significant to require debt. Project is included City of Harrisonburg Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- proj202 Harrisonburg Public Utilities formats its Capital Improvement Program (CIP) to provide funding for two applications: 1. Capital Rehabilitation and Retirement (R&R): R&R is the retirement of existing assets at an optimum time near the end of their life cycle but with opportunity to avoid ancillary financial, social or environment burden. The HPU CIP process uses asset retirement date forecasts made from known installation dates and from Manufacturer's Anticipated Service Life (MASL). The CIP process provides Future Asset Replacement Cost (FARC) by inflating the Current Asset Replacement Cost (CARV) by two-andone-half percent annually to the retirement date. 2. Capital Expansion (Expansion): Expansion is the addition of new assets with the purpose of expanding service, capacity, functionality or strategy of operations. Project is included City of Harrisonburg Fiscal Year 2025-2029. As of April 4, 2025, project is funded for FY2025 and past 2029. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$36,707,879.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
To Be Determined, Harrisonburg, VA
Related To This Project
Harrisonburg, VA
Bid Date: Jan 06 2022
Harrisonburg, VA
Bid Date: Jan 19 2022
Harrisonburg, VA
--
Harrisonburg, VA
--
Harrisonburg, VA
Bid Date: Feb 15 2022
Harrisonburg, VA
--
Harrisonburg, VA
Bid Date: Feb 11 2022
Harrisonburg, VA
--
Harrisonburg, VA
Bid Date: Sep 29 2023
Harrisonburg, VA
--
Harrisonburg, VA
--
Harrisonburg, VA
Bid Date: Sep 14 2023
Harrisonburg, VA
--
Harrisonburg, VA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
