BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a mixed-use development in Hosford, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Liberty Road Name: SR 20 Limits: From E of Apalachicola River Bridge to E of Nw Revell Rd Project(s): 43626225201(*) Federal Aid No: D323045B Project(s): 43626225203(*) Federal Aid No: N/A Total Roadway Length: 1.144 Miles Contract Days: 190 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.144 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 days Description: The Improvements under this Contract consist of milling and resurfacing of SR 20 from E of Apalachicola River Bridge to E of NW Revell Road in Liberty County under FPID 436262- 2-52-01. Other improvements under this project include sidewalk replacement, drainage improvements, curb and gutter, signing and pavement markings, signalization, and lighting. FPID 436262- 2-52-03 includes utility manhole adjustments. Question Deadline 9/20/2023 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 010: Resurfacing / Lighting / Traffic Signals - SR 20

Award

Roads / Highways

$2,142,434.00

Public - State/Provincial

Paving, Site Work

145

9

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
28
Bidding Soon
339
All Active Projects
128
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2023

October 7, 2023

img_map_placeholder

FL-20, Hosford, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.