BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Manteca, California. Conceptual plans call for the renovation of a water / sewer project.

Deadline for Clarifications /Inquiries September 7, 2023 at 5:00 PM PST. Award of Contract (tentative) October 3, 2023. Proposals received past the deadline will not be considered. The City accepts no responsibility if delivery is made to another electronic mail address or other technological issues that cause a submittal to be late or not received by the deadline. An evaluation team will review submitted proposals and select the best proposal based on the evaluation criteria outlined in the RFP. The selected consultant will then be recommended to the City Council for entering into a contractual agreement for services. Submittals, Inquiries and Contact Information Kyzen Nicolas, Assistant Engineer knicolas@manteca.gov Makenna Brown, Engineering Intern mbrown@manteca.gov. The City is seeking proposals from engineering consultant firms to provide WQCF sludge thickener and dewatering unit no.3 system designs on behalf of the City. The following summary of the scope of services is not inclusive and is only intended to be used as an indication of the minimum services to be provided. The City's expectation is that the scope of services for this Project shall include all work necessary for the completion of the Project with no future amendments required to the contract. The consultant's scope of services for this Project shall include, but not be limited to, the following: o The consultant shall review and evaluate the documents related to this Project in detail. See Appendix. o The consultant shall evaluate the existing system and provide recommendations for addressing the increased solids o The consultant should provide review of alternative technologies compared to what is currently existing. o The consultant shall visit the WQCF and meet with staff to become familiar with the sludge thickener and dewatering equipment identified for improvement in this RFP, understand their operations, constraints, deficiencies and the O&M issues. The consultant can schedule the kickoff meeting and site visit concurrently. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$350,000.00

Public - City

Renovation

84

75

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
91
Bidding Soon
1,899
All Active Projects
775
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2023

img_map_placeholder

To Be Determined, Manteca, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.