BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 7, 2023 at 8:00 PM

Updated June 17, 2025

Site work and paving for a road / highway in Madison, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Madison Traffic Engineering ("City") is soliciting Bids from qualified vendors for Todd Drive Crosswalks. Vendors submitting Bids ("Bidders") are required to read this Request for Bids ("RFB") in its entirety and follow the instructions contained herein. Questions Due Date: Wednesday, August 30, 2023 Answers Posted Date: Friday, September 1, 2023 The City reserves the right to accept or reject any or all Bids submitted, in whole or in part, and to waive any informalities or technicalities, which at the City's discretion is determined to be in the best interests of the City. Further, the City makes no representations that a contract will be awarded to any Bidder responding to this request. The City expressly reserves the right to reject any and all Bids responding to this invitation without indicating any reasons for such rejection(s). The City reserves the right to postpone due dates and openings for its own convenience and to withdraw this solicitation at any time without prior notice. 1.17 Withdrawal or Revision of Bids Bidders may, without prejudice, withdraw Bids submitted prior to the date and time specified for receipt of Bids by requesting such withdrawal before the due time and date of the submission of Bids. After the due date of submission of Bids, no Bids may be withdrawn for a period of 90 days or as otherwise specified or provided by law. Bidders may modify their Bids at any time prior to opening of Bids Delivery of electronic copy to: via email to bids@cityofmadison.com The City of Madison, Traffic Engineering Division invites you to submit a bid for installation of epoxy crosswalks on Todd Drive. We expect the work to be completed between 8:30 a.m. - 3:30 p.m. on weekdays, while maintaining traffic at all times. The work is to be completed by Monday, October 23, 2023.

Award

Roads / Highways

$12,908.00

Public - City

Paving, Site Work

7

5

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
171
Bidding Soon
1,789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2023

October 6, 2023

Project location map

Todd Dr, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.