BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Wilson, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of November 7, 2023, project was awarded to GoreCon Inc., awarded amount is $128,586.04. A certified check or bid bond in the amount of ten percent (10%) of the bid, made payable to the Owner. The successful bidder shall be bound to furnish and pay for a Performance Bond and a Labor (Public Works Contractors Bond Law of et seq) & Material Payment Bond in an amount equal to one hundred percent (100%) of the contract price, and a Maintenance Bond Bond in an amount equal to fifteen percent (15%) of the contract price, on bond forms acceptable to the Owner. Said surety to be licensed to conduct business in the Commonwealth of Pennsylvania. The contractor must utilize, to the greatest extent feasible, minority and/or women owned business (MBE/WBE) concerns. The contractor must establish a 3% goal for WBE participation and a 5% goal for MBE participation. The contractor is required to utilize, to the greatest extent feasible, low-income area businesses, trainees, and employees within the general trade area. The contracting goal is 10% and the employment goal is 30%. The Owner reserves the right to reject any and or all bids and to waive any informality in the bidding, as permitted by law. Question Deadline 09/08/2023 at 3:00 PM ET Every request for such interpretation should be in writing submitted via PennBid If, at the time this Contract is to be awarded, the lowest bid submitted by a responsible bidder exceeds the amount of CDBG funds available to the Owner for this Contract, the scope of work may be reduced by the Owner by reducing the project scope to achieve a contract cost which does not exceed the CDBG funds available. If the scope of work is reduced, it would be reduced by first removing the block of Forest Street from 24 th Street to 25th Street. If additional reduction is necessary, the scope would be further reduced by removing the block of Forest Street from 23rd Street to 24th Street. This project consists of the following a. 1.5" mill and overlay on one (1)) Borough Road. Please note the installation of Safety Edge is incidental to this work. b. Base repair as needed. If at the time this Contract is to be awarded, the lowest bid submitted by a responsible bidder exceeds the amount of CDBG funds available to the Owner for this Contract, the scope of work will be reduced. The Owner shall determine which sections of road will be eliminated.

Award

Roads / Highways

$128,586.00

Public - County

Paving, Site Work

6

13

2

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
428
Active Projects
220
Bidding Soon
4,089
All Active Projects
1,916
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

October 13, 2023

img_map_placeholder

Forest St, Wilson, PA


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.