BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2025 at 7:00 PM

Updated February 26, 2025

Site work for a water / sewer project in Charlottesville, Virginia. Conceptual plans call for site work for a water / sewer project.

Update: https://www.rivanna.org/wp-content/uploads/2024/06/2025-2029-CIP-Final-Draft.pdf The existing Raw Water Pump Station and Intake at the Beaver Creek Reservoir was constructed in 1964 and is located at the foot of the Beaver Creek Dam. Obligatory dam safety upgrades to the Beaver Creek Dam spillway necessitate moving the pump station away from its current location downstream of the dam. Additionally, the Drinking Water Infrastructure Plan for the Crozet water service area recommends installation of a new Raw Water Pump Station and Intake to meet new minimum instream flow requirements and provide adequate raw water pumping capacity to serve the growing Crozet community for the next 50 years. The new pump station will be constructed adjacent to the dam on the Beaver Creek Reservoir. The new intake structure will include enhanced controls as well as a Hypolimnetic Oxygenation System to enhance water quality within the reservoir Project is included in Rivanna Solid Waste Authority Fiscal Year 2025-2029 Page No.29 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A detailed scope of work has not been disclosed. As of September 18, 2023, this project is included in the Rivanna Solid Waste Authority's Fiscal Year 2024-2028 CIP and funding allotted for FY 2024, FY 2025, FY 2026, and FY 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$19,250,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
130
Bidding Soon
1,846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

To Be Determined, Charlottesville, VA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.