Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 30, 2023 at 7:00 PM

Updated August 8, 2025

Site work and paving for a mixed-use development in Crystal Lake, Illinois. Completed plans call for site work for a municipal facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sidewalk Entrace Replacement at Municipal Complex Est. Completion Date: April 16, 2024 Work includes replacing the concrete surface area at the main entrance, and one side entrance, to Crystal Lake's Municipal Complex (City Hall). Existing PCC entrance will be saw cut and removed, aggregate base will be prepared, and proposed PCC entrance will be installed in accordance with ADA requirements.

Bid Results

Sidewalks / Parking Lot

$42,034.00

Public - City

Paving, Site Work

4

12

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
645
Active Projects
253
Bidding Soon
4,661
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2023

October 12, 2023

Project location map

100 W Woodstock St, Crystal Lake, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed