Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a military facility in Flagstaff, Arizona. Completed plans call for site work for a military facility.
1) Contractor will construct approximately 3 miles of new fence where existing livestock pasture fence is no longer able to be maintained on the Black Bill Allotment: a) Pasture Fence 1 between Summit and North Black Bill Pastures - 3strand (top 2 wires barbed and the bottom wire smooth) to Forest Standards (Appendix A). b) Pasture Fence 12 between North Black Bill and South Black Bill - 3 strand (top 2 wires barbed and the bottom wire smooth) to Forest Standards (Appendix A). 3) Contractor will construct approximately 13 breakaway fences (items 2-11 and 13-15 on the map). This will be a 4-strand fence (top 3 wires barbed and the bottom wire smooth) built to Forest Standards (Appendix A). Contractor will use Bar None Braces for H-braces. 4) Contractor will roll up and remove from Forest Lands approximately 3 miles of fence from the Lockwood Springs and Barney Pastures on the Windmill West Allotment. 5) Contractor will conduct hazard tree removal along the two pasture fences (a and be above), approximately 3 miles. The contractor will provide the following fence materials for the project: barbed wire, smooth wire, steel brace posts and down braces plus hardware, wood stays, stay wire, fence clips. The Contractor shall provide any other miscellaneous supplies or materials needed. Contractor shall furnish all tools, equipment, supervision, transportation, and safety equipment necessary to complete the project. Contractor shall follow the Standard Specifications and the Standard Fire Plan. Project Locations Project areas and fence segments are on the following allotments on the Flagstaff Ranger Districts of the Coconino National Forest, Coconino County, Arizona: Summit and North Wild Bill Pasture Fence -1 mile re-construction; 1 mile hazard tree removal; 1 mile of fence roll up and removal Shown as item #1 on the map below Runs east-west, Secs 5, T22N, R8E The fence is a pasture fence that will be used to contain and manage cattle distribution. The ground that the fence is built on is rocky and hilly. Elevation is approximately 7,000 feet. Weather conditions can change quickly, particularly during the summer monsoon period of July, August and September when strong thunder and lightning storms occur. Snowfall is common in the late fall throughout the winter. North Wild Bill and South Wild Bill Pasture Fence - 1.25 miles re-construction; 1.25 miles hazard tree removal; 1.25 miles of fence roll up and removal Shown as item #12 on the map below Runs east-west Secs 18 T22N, R8E The fence is a pasture fence that will be used to contain and manage cattle distribution. The fence is on rocky ground that is hilly. Elevation is approximately 7,000 feet. Weather conditions can change quickly, particularly during the summer monsoon period of July, August and September when strong thunder and lightning storms occur. Snowfall is common in the late fall throughout the winter. Replacement of breakaway fencing is at 13 locations along the western allotment fence line. Existing breakaway fencing will be removed. Shown as items #2-11 and #13-15 on the map below Elevation is approximately 7,000 feet. Weather conditions can change quickly, particularly during the summer monsoon period of July, August and September when strong thunder and lightning storms occur. Snowfall is common in the late fall throughout the winter. 09/08/2023 at 5:00 PM MT Submit RFI's via to derek.lavey@usda.gov AZ202300030-06-09-2023 Black Bill Allotment fence replacement for fence damaged by Tunnel and Pipeline Fires
Post-Bid
Military
$100,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2023
November 1, 2023
Multiple Locations, Flagstaff, AZ
Related To This Project
Flagstaff, AZ
--
Flagstaff, AZ
Bid Date: Nov 13 2023
Flagstaff, AZ
Bid Date: Oct 04 2023
Flagstaff, AZ
Bid Date: Sep 15 2023
Flagstaff, AZ
Bid Date: Oct 02 2023
Flagstaff, AZ
Bid Date: Dec 16 2021
Flagstaff, AZ
Bid Date: Jan 11 2022
Flagstaff, AZ
--
Flagstaff, AZ
Bid Date: Aug 25 2023
Flagstaff, AZ
Bid Date: Sep 06 2023
Flagstaff, AZ
Bid Date: Sep 11 2023
Flagstaff, AZ
Bid Date: Aug 25 2023
Flagstaff, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.