BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Manhattan Beach, California. Completed plans call for the renovation of a municipal facility.

The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of BIDS. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. This Ceramic Studio Kiln Installation (D-937) CIP project constructing shade structure and extending utilities (gas, electric, etc.) for the new kiln installation by others adjacent to outdoor structure containing existing two kilns outside of the Parks and Recreation Ceramic Studios building located in Live Oak Park. Work includes constructing a new shading structure with equipment pad for ceramics kiln and relevant electrical and gas hookups, constructing new fences and gates for security, and demolishing existing fence and concrete slab on grade. Note majority of the concrete slab on grade work is for ADA path of travel to the kiln. Start/Delivery Date Spring 2024 Project Duration 70 Days Liquidated Damages $250 per day Online Q and A Yes Q and A Deadline 12/05/2023 11:00 AM (PST) Anticipated City Council award of contract date: 1/16/24 Pertinent Project Information: Typically the City does not have any readily available staging area and as such it is usually the Contractor's responsibility to procure a staging area at his/her expense. However, for this CIP Parks and Recreation Department are providing two staging areas (~25ft x 50ft and ~15ft x 20ft) inside Live Oak Park for duration of the project and two access routes through Live Oak Park (see Appendices for details).

Award

Municipal

$273,773.00

Public - City

Renovation

28

29

2

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
487
Active Projects
232
Bidding Soon
3,813
All Active Projects
1,719
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 13, 2023

March 20, 2024

June 18, 2024

img_map_placeholder

110 S Rowell Ave, Manhattan Beach, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.