BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Gulf Shores, Alabama. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

https://www.al.com/news/mobile/2024/02/which-firm-will-be-chosen-to-build-gulf-shores-131m-high-school.html The city of Gulf Shores is expected to award Rabren Construction the contract to build the new Gulf Shores High School on a 200-acre site near the southwest intersection of Coastal Gateway Boulevard (Baldwin County 8) and the Foley Beach Express, according to city records. Rabren is based in Auburn and was the lowest bidder. The construction contract is not to exceed $131 million. The new high school will be a cutting-edge facility totalling 287,000 square feet and designed to educate more than 1,000 students. ------------------------------------------------------------------------------------------------------------------------ https://gulfcoastmedia.com/stories/gulf-shores-approves-131-million-contract-to-build-new-high-school,202783 The new Gulf Shores High School took a big step Monday, as the Gulf Shores City Council approved a $131 million contract to construct the city school's new high school at their Feb. 5 work session meeting. At the meeting, the contract was awarded to Rabren Construction, which will incorporate features including an array of collaborative learning spaces, including cutting-edge classrooms uniquely designed to be scaled to accommodate class sizes from 20 to 200. Additionally, the new building, which will include accommodate students in grades 9-12, will feature hands-on learning and leading-edge technology in bio-medical, marine biology, engineering, culinary and finance labs, maker spaces, art, music production and broadcast studios. There will also be a new state-of-the-art performing arts center and dedicated spaces for band, choral and drama students and a new athletic center for all sports including locker rooms for all varsity and junior varsity teams, two competition-size gymnasiums, tiered meeting rooms, athletic training rooms, coaches' office suites and an additional 18,000-square-foot field house complete with an athletic performance center planned to be connected to a covered 100-yard practice pavilion that will provide year-round training opportunities for all Dolphin athletes. The school system became its own district in 2019 after separating from Baldwin County Public Schools and began collaborating with the city in January 2021 in preparation of the school system's need over the next 10 years as the city and student body continues to grow. ______________ Work will include a 2 story 260,828 SF high school. Construction Duration: 600 Calendar days Questions to Travis Deatherage travis.deatherage@white-spunner.com 251-300-3840 Send quotes to estimating@white-spunner.com or fax to 251-300-3870 Sitework, Site Utilities, Fencing & Gates, Termite Treatment, Concrete SOG, Walks, Architectural Precast, Rebar, CMU, Brick Veneer, Brick Pavers, Steel Fabrication, Steel Erection, Miscellaneous steel, Decorative Railings, Blocking, Millwork, Fiberglass Panels, Thermal Insulation, TPO Roofing, Firestopping, Joint sealants, Doors and Hardware, Overhead Doors, Door Hardware, Storefront, Glazing, Acoustical ceiling, Metal stud framing, Drywall, Tape and Finish, Acoustical Security Ceiling System, Resilient Flooring, Athletic Flooring, Tile, Carpet, Paint, Wall Covering, Sealed Concrete, Acoustical Wall Treatment, Specialties, Signage, Wall Protection, Lockers, Awnings, Flagpoles, Sports Equipment, Window Shades, Fixed Audience Seating, Pew Seating, Pre-engineered Metal Buildings, Elevator, AV Equipment, Lighting & Rigging, Fire Sprinkler, HVAC & Equipment, Plumbing & Fixtures, Electrical & Gear/Fixtures, Fire Alarm, Low Voltage, Communications, Security & Surveillance Systems.

Award

Educational

$131,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
29
Bidding Soon
461
All Active Projects
207
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2023

February 6, 2024

img_map_placeholder

600 E 15th Ave, Gulf Shores, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.