Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 18, 2023 at 8:00 PM
Updated January 26, 2024
Demolition, site work and addition to a mixed-use development in Crofton, Nebraska. Conceptual plans call for the addition of a power facility; power facility; power facility; and power facility.
As of October 18, 2023, Omaha Public Power District board voted 8-0 Thursday to move forward a historic $2 billion expansion that will nearly double the utility’s electric generating capacity over the next decade. Further details regarding design and construction have not been identified. A firm timeline for construction has not been established. A detailed scope has not yet been released. The plan approved Thursday calls for 1,000 to 1,500 megawatts of wind and solar generation, a figure that includes up to 600 megawatts of renewable power approved in 2019 that the utility is still working to bring online. Also included are 600 to 950 megawatts of natural gas, at least 32 megawatts of demand response (shifting or shedding electricity demand to help balance the grid), up to 125 megawatts of battery storage, and approximately 320 megawatts of added fuel capability and fuel oil storage at existing generation facilities. They will provide backup for when the wind isn't blowing and the sun isn't shining, help the utility meet demand at peak times, fill reserve requirements and make possible the introduction of the new renewable resources. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Conceptual
Wind Power Generation
$2,000,000,000.00
Public - State/Provincial
Addition, Demolition, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 7, 2024
Multiple Locations, Crofton, NE
Related To This Project
Crofton, NE
Bid Date: Dec 08 2023
Crofton, NE
Bid Date: Mar 04 2024
Crofton, NE
Bid Date: May 21 2024
Crofton, NE
--
Crofton, NE
Bid Date: Aug 09 2024
Crofton, NE
Bid Date: Sep 19 2024
Crofton, NE
Bid Date: May 07 2025
Crofton, NE
Bid Date: Jul 25 2025
Crofton, NE
Bid Date: Mar 23 2022
Crofton, NE
Bid Date: Apr 08 2021
Crofton, NE
Bid Date: Sep 14 2021
Crofton, NE
Bid Date: Jul 28 2023
Crofton, NE
Bid Date: Jun 28 2023
Crofton, NE
Bid Date: Jul 18 2022
Crofton, NE
Bid Date: Jul 21 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed