BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a mixed-use development in Crofton, Nebraska. Conceptual plans call for the addition of a power facility; power facility; power facility; and power facility.

As of October 18, 2023, Omaha Public Power District board voted 8-0 Thursday to move forward a historic $2 billion expansion that will nearly double the utility’s electric generating capacity over the next decade. Further details regarding design and construction have not been identified. A firm timeline for construction has not been established. A detailed scope has not yet been released. The plan approved Thursday calls for 1,000 to 1,500 megawatts of wind and solar generation, a figure that includes up to 600 megawatts of renewable power approved in 2019 that the utility is still working to bring online. Also included are 600 to 950 megawatts of natural gas, at least 32 megawatts of demand response (shifting or shedding electricity demand to help balance the grid), up to 125 megawatts of battery storage, and approximately 320 megawatts of added fuel capability and fuel oil storage at existing generation facilities. They will provide backup for when the wind isn't blowing and the sun isn't shining, help the utility meet demand at peak times, fill reserve requirements and make possible the introduction of the new renewable resources. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Wind Power Generation

$2,000,000,000.00

Public - State/Provincial

Addition, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
15
Bidding Soon
183
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2024

img_map_placeholder

Multiple Locations, Crofton, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.