BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of a conference / convention center in Monterey, California. Completed plans call for the renovation of a conference / convention center.

General work description: In general, the work consists of, but is not limited to, demolition of the existing two-cell cooling tower, demolition of the existing 75-ton air cooled chiller, demolition of the existing chilled water pump, installation of a new cooling tower, installation of a new air-cooled chiller, installation of new chilled water pumps, water balance the chillers, cooling tower and associated pumps, water balance the air handling units chilled water coils, and patch and repair the roof at locations impacted by the new equipment supports. Question Submission Deadline:September 27, 2023, 5:00pm

Award

Conference / Convention Centers

$1,258,931.00

Public - City

Renovation

19

7

2

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
87
Bidding Soon
1,110
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2023

November 2, 2023

Project location map

1 Portola Plaza, Monterey, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.