BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Marshall, Michigan. Completed plans call for the renovation of a power facility.

**As of December 21, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** SCOPE OF WORK Hardware and Software The SCADA system must be installed on 2 separate, redundant, physical servers. Virtualization is an option, as long as the 2 SCADA hosts are in separate physical locations with dark fiber running between them. These servers must run on the most recent operating systems supported by the SCADA vendor, ideally Windows Server 2022. The system should be installed on new hardware that meets the minimum required specifications specified by the SCADA vendor. The installation should utilize the latest version of the SCADA software. To ensure proper synchronization, both servers must be configured to utilize the GPS clock, and thorough validation of time syncing between the servers is essential. Specifically, one server will be installed in the Powerhouse, while the other will be in Plant 2. Servers and workstations should be provided by the implementor. The SCADA system must be accessible from 3 identical workstations running the most recent operating systems supported by the SCADA vendor, ideally Windows 11. These workstations must be new hardware that meets the minimum requirements specifications defined by the SCADA vendor. The most recent version of the SCADA software must be installed. To ensure accurate time synchronization, the workstations must be configured to utilize the GPS clock, and accurate time synchronization must be validated. The workstations will be allocated as follows: one in the Powerhouse control room, another in Plant 2, and the third in the Public Services Building. The third workstation will serve solely for monitoring purposes and should not have the capability to send controls. The City of Marshall Electric Department seeks to replace and upgrade the SCADA system. The city operates four substations and two power plants. The current SCADA is operating with two RTU, that need updating to RTEC. In addition, the city is adding four new generation units that will also need to be added to the SCADA system. PAYMENT The awarded contractor may issue invoices to the city for payment via progress payments at 25%, 50%, and 75%, and 100% completion. Each invoice shall include detail of progress. SITE VISIT It is strongly suggested that interested parties make a sight visit to familiarize themselves with the scope of work and to ask any questions and make any clarifications to the scope of work. Site Visits are available Monday-Friday, 7AM-3PM Eastern Time. Schedule with Kevin Maynard, Director or Electric Utilities at KMaynard@CityofMarshall.com and Jeff Taylor, Lead Operator at JTaylor@CityofMarshall.com AWARD OR REJECTION OF BID The Contract will be awarded to the most responsive and responsible bidder complying with these instructions and with the advertisement. The City reserves the right to reject any or all bids in whole or in part thereof for any reason deemed solely by the City of Marshall to be in its best interest.

Bid Results

Power Plant

$109,652.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
83
Bidding Soon
1,083
All Active Projects
458
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.