BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2024 at 8:00 PM

Updated September 11, 2024

Site work and paving for a bridge / tunnel in North Woodstock, New Hampshire. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

County : Grafton Scope of Work: Bridge Rehab of Red List bridge carrying NH 175 over Pemigewasset River (177/148) Location: NH Route 175 Proposal Guarantee: 5% of bid amount This Project Will Rehabilitate the Existing State Red List Bridge (Br. No. 177/148) Carrying Nh 175 (Eastside Road) Over the Pemigewasset River in Woodstock Question Deadline - 08/01/2024 at 2:00 PM ET, Bidders Should Act Promptly and Submit All Questions Pertaining to the Project in Writing to Jennifer Reczek at Jennifer.e.reczek@dot.nh.gov at Least Five (5) Business Days Before the Hour and Date Set for the Bid Opening. No Phone Calls or Faxes Will Be Accepted. All individuals, firms, partnerships or corporations intending to bid, must file a statement showing their qualifications with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids. No authorization to bid will be granted to a prospective bidder not prequalified. If contract price is $35,000 or more, the successful bidder will be required to furnish electronically, at the time of approval, a contract bond in the amount of one hundred (100) percent of their bid Project completion date is 11/6/2026 The right is reserved to waive any informalities in or to reject any or all proposals. NH DOT - Bridge Rehabilitation of Red List Bridge Carrying NH 175 Over Pemigewasset River This project rehabilitates the existing State Red List bridge (Br. No. 177/148) that carries NH 175 (East Side Drive) over the Pemigewasset River. The bridge is located approximately 300 feet east of the intersection of NH 175 and US 3. The existing bridge was built in 1939 and is a single span steel tied through-arch with a length of 175 feet between bearings at abutments. The bridge width is 24'-0" between curbs. The bridge is currently reduced to a single lane of traffic operating with a stop/yield condition. It is posted for a weight limit of 3 tons, passenger cars only. The limits of work begin approximately 185 feet west of the bridge on NH 175 and continue approximately 575 feet easterly on NH 175 across the bridge. The work includes (refer to the Plans for detailed information): Rehabilitation of the bridge abutments and wingwalls. Replacement of the floor system including bridge deck, stringers, and floor beams. Replacement of the arch rib cable ties including installation of temporary ties. Replacement of the bridge deck expansion joints, and bridge rail. Replacement of bridge shoes. Cleaning and painting the structural steel, including environmental protection and compliance with lead-bearing paint (LBP) removal regulations. Full-depth reconstruction of the roadway approaches to the bridge. The bridge will be closed, and traffic detoured during the construction operations as described elsewhere in the Proposal.

Award

Bridges / Tunnels

$11,146,028.00

Public - State/Provincial

Paving, Site Work

112

8

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
51
Bidding Soon
864
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

October 8, 2024

Project location map

New Hampshire Rte 175, North Woodstock, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.