BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 21, 2024 at 8:00 PM

Updated June 22, 2024

Site work for a road / highway in North Woodstock, New Hampshire. Completed plans call for site work for a road / highway.

County : Grafton, Hillsborough, Merrimack Scope of Work: Durable pavement markings Location: Various Proposal Guarantee: 5% of bid amount the Project Constructs Permanent Grooved Pavement Markings (Durable Polyurea) Along Tier 1 and 2 Roadways Within Three (3) Sections; I-93 in Woodstock-lincoln, I-93 Southbound in Hooksett-manchester Between the I-293 Junctions, and Us 202 From Hillsborough at Nh 31 to Hopkinton at the I-89 Sb on Ramp. A schedule of the minimum wages for all labor classifications as determined by the Secretary of Labor pursuant to Section 115 of the Federal Aid Highway Act of 1956 is included in the proposal. Unskilled labor may be hired from lists prepared by the NH Department of Employment Security designated in the proposal Question Deadline 06/06/2024 at 2:00 PM ET- Bidders Should Act Promptly and Submit All Questions Pertaining to the Project in Writing to Julie Mathews at Julie.l.mathews@dot.nh.gov at Least Five (5) Business Days Before the Hour and Date Set for the Bid Opening. No Phone Calls or Faxes Will Be Accepted. All individuals, firms, partnerships or corporations intending to bid, must file a statement showing their qualifications with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids. No authorization to bid will be granted to a prospective bidder not prequalified. If contract price is $35,000 or more, the successful bidder will be required to furnish electronically, at the time of approval, a contract bond in the amount of one hundred (100) percent of their bid. Project completion date is 7/25/2025 The right is reserved to waive any informalities in or to reject any or all proposals. NH DOT - Durable Pavement Markings DESCRIPTION OF WORK The project constructs permanent grooved pavement markings (durable polyurea) along Tier 1 and 2 roadways within three (3) sections: I-93 in Woodstock-Lincoln, I-93 Southbound in Manchester-Hooksett between the I-293 junctions, and US 202 from Hillsborough at NH 31 to Hopkinton at the I-89 SB on ramp. Ramps are included in each section. This project has a total length of 50.2 miles and is located within Districts 1, 3, 4, and 5. This Contract will replace all existing 6 travel way and lane paint markings with 6 Grooved Retroreflective Pavement Markings. The existing 12 gore lines will be replaced with 12 Grooved Retroreflective Pavement Markings. The Woodstock-Lincoln section will install all lines on the I-93 Northbound and Southbound mainline and extend onto the ramps. The Manchester-Hooksett section will install all lines on I-93 Southbound and extend onto the ramps. The Hillsborough-Hopkinton section will install all white lines along US 202 including lane lines and onto the ramps. Centerline on US 202 is not included on this project. This project will include two (2) Retroreflectometer Systems to be provided directly to NHDOT and installed by the vendor on NHDOT vehicles. These systems will be used to evaluate the retroreflectivity of pavement markings

Award

Roads / Highways

$1,554,500.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
46
Bidding Soon
864
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

August 12, 2024

Project location map

Multiple Locations, North Woodstock, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.