Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Oklahoma City, Oklahoma. Contact the soliciting agency for additional information.
The Oklahoma City Air Logistics Complex (OC-ALC) uses a variety of dust filtration and collection systems to capture hazardous byproducts of thermal and plasma spray processes including very fine metal and non-metal powders. These systems typically capture dust byproducts in 55-gallon drums below the filtration system, which house a varying number of filters. Legacy systems supporting plasma spray processes often experience unwanted escapes or accidental releases of the byproducts from the filter housing, waste drum collar seals and during drum change outs, which have necessitated a need for constant cleaning of dust byproducts in the work area. Additionally, filter change outs involve extensive PPE as well as tenting-off of production areas surrounding the filtration system to help contain dust as filters are removed and packaged for proper disposal. As such OC-ALC is seeking a better dust filtration and collection system that minimizes escapes and accidental releases to avoid constant cleaning and extraordinary prevention measures during filter changes. Ideally, such a system would allow the user to remove the contained filters and collected dust and transport them to a separate location (either temporary or permanent) where the filters and collected dust can be removed and placed in appropriate waste containers without unwanted escapes or accidental releases. Alternatively, a system that contains the filters and dust collector could be disposed of in its entirety. Such systems should minimize escapes and accidental releases during normal operation and filter and dust collector change out over legacy dust filtration and collection systems. An area where OC-ALC could potentially employ such a system is in support of its plasma spray operations. Two possible locations where such systems could be installed are outside of OC-ALC building 3001. The current available footprint for each system is nominally 12 feet by 8 feet. They are connected to the plasma booths via ductwork that is approximately 175 feet and 150 feet long. These systems are required to have a nominal flow of 10,000 CFM to achieve an air flow at the face of the exhaust inside the plasma booth in excess of 300 feet per minute. The method of Contractor Selection has not been Determined at this time.
Conceptual
Municipal
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2024
To Be Determined, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
Bid Date: Oct 02 2023
Oklahoma City, OK
Bid Date: Aug 30 2023
Oklahoma City, OK
Bid Date: Sep 12 2023
Oklahoma City, OK
Bid Date: Oct 04 2023
Oklahoma City, OK
Bid Date: Oct 03 2023
Oklahoma City, OK
Bid Date: Sep 27 2023
Oklahoma City, OK
Bid Date: Sep 13 2023
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Oct 12 2023
Oklahoma City, OK
Bid Date: Sep 12 2023
Oklahoma City, OK
Bid Date: Nov 29 2023
Oklahoma City, OK
Bid Date: Sep 21 2023
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Sep 20 2023
Oklahoma City, OK
Bid Date: Sep 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.