BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of a fire / police facility in Fort Pierce, Florida. Completed plans call for the demolition of a fire / police facility; for the renovation of a fire / police facility; and for site work for a fire / police facility.

Fire Station #9 Concrete Renovations Prior to bidding, inspect site and take into consideration any omissions, underground utilities, or other items affecting the installation of paving, drainage, and utilities. Should unmarked or incorrectly marked utilities or other items be encountered during construction, notify Construction Manager immediately. 2. Prior to commencement of demolition and concrete replacement, Subcontractor shall video existing surfaces and submit to Construction Manager. 3. All materials and workmanship shall be in accordance with all applicable City, County, State and Federal Regulations, Codes, and Ordinances, including OSHA and FDOT Specifications, latest edition unless otherwise authorized by the Engineer in Writing. 4. No field changes or deviations from design shall be made without prior written approval of the Engineer of Records. 5. Demolition and off-haul of all concrete debris is included in this scope of work. 6. Control joint layout shall be submitted by the Subcontractor as a shop drawing to the engineer of record for approval. 7. All work shall comply with the American Concrete Institute (PRC-330). 8. This scope of work includes removal & restoration of concrete washout areas. 9. Plan for a total of two mobilizations, one for front and one for rear of Fire Stations so not to impede on daily Fire Station Operations. Access in and out of Fire Stations cannot be fully blocked at any time. Coordination will be made daily with fire station personnel to ensure the scope of work does not impede any of the fire department operations. 10. All areas disturbed by construction shall be restored to pre-construction conditions or better. All existing signage, pavement markings, above ground appurtenances, etc. shall be restored in kind. This includes any sod replacement. 11. All concrete shall develop a 28-day compressive strength of 3,000 PSI. 12. This scope will implement erosion and sedimentation controls in accordance with the drawings and specifications. 13. All forming, spacing and finishing for all concrete shown to be replaced is included. 14. All excavation, backfill and prep work including compaction. Areas where concrete is to be replaced shall be kept free of water. 15. All reinforcing shall be furnished and installed in this scope of work. 16. Include all receiving, unloading and placement of materials

Post-Bid

Fire / Police

$500,000.00

Public - County

Demolition, Renovation, Site Work

5

3

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
34
Bidding Soon
711
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2023

October 26, 2023

img_map_placeholder

3595 N Hwy A1A, Fort Pierce, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.