BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Denver, Colorado. Working plans call for the renovation of a 69,552-square-foot educational facility.

The owner has selected a Construction Manager. Community College of Denver (CCD) invites proposals from qualified Construction Manager/General Contractor (CM/GC) firms for services associated with the state funded Boulder Creek Health Science Renovation, Phase 1 and 2 project. Construction is anticipated to begin in January of 2025 and must be completed no later than December 2026 CCD was approved for $38,685,254 in funding for a full 59,900 SF renovation of Boulder Creek, plus a 9,652 SF addition on the SE side of the building. The Boulder Creek Health Science Renovation will house the following CCD Departments: Dental Hygiene, Health and Wellness, Nursing, Phlebotomy/Medical Assisting, Radiologic Tech, Surgical Tech, and Vet Tech. The targeted construction value is $30,000,000. This project consolidates all of CCD's health programs into a strategically focused Health Science Center. CCD's primary goal is to develop the next generation of medical professionals. This facility will house CCD's growing Health Science programs, with laboratories incorporating the latest technology, providing an improved teaching and learning environment for students and faculty. The new Health Science Renovation will bring together diverse programs currently spread across two campuses, allowing for cross-disciplinary collaboration. The facility will have a simulation hospital, with X-ray rooms and nursing skills labs, that allows collaboration between the different health programs preparing students to be an integral part of a healthcare team and help students inter-professional competencies. This facility will also have a full Dental Hygiene clinic, and a Vet Tech clinic that provides community access to healthcare. There will be a teaching kitchen, a small gym, a student lounge, collaboration spaces, faculty offices and classrooms. Currently, the cannabis lab has been renovated and will be occupied and functional during construction in 3,386 SF of space in the building. In addition to the cannabis lab constraint, CCD must coordinate with the Auraria Higher Education Center (AHEC) on Project B and Project C in Boulder Creek. Project B is a $3M HVAC replacement for the AHUs on the building (the CM/GC for Project B is already selected). Project C is a $1.3M window replacement for Boulder Creek. The selected CM/GC for the Boulder Creek renovation will have the opportunity to bid Project C, but there will be the possibility of having a total of three (3) CM/GCs/contractors that will need to coordinate construction during the Boulder Creek renovation. CCD is using a Construction Manager/General Contractor (CM/GC) approach to project delivery. A Guaranteed Maximum Price (GMP) and an updated project duration schedule will be established by Clark and Enersen (the Architect/Engineer) and the Construction Manager/General Contractor in conjunction with the Community College of Denver and CBRE, the Owner's Representative. The CM/GC will evaluate, among other things, availability of materials and labor, project schedule, project costs as they relate to the established budget, constructability, and will work closely with the Architect/Engineer and CCD throughout the planning, design and construction phases of the project. Construction is estimated to commence in January 2025. The process to be used in the selection of the CM/GC is comprised of two steps. STEP I is the Submittal of Prequalification as described in Section II (D). STEP II is the Interview/Cost Proposal as described in detail in Section III. A Jury Panel of individuals who will be involved in the project and/or understand the required services associated with Construction Management/General Contracting will evaluate responses to this RFP for both STEPS. Upon completion of the evaluation of the Submittals of Prequalification, a limited number of firms will be invited to interviews. Sealed Cost Proposals will be required only from those firms who are interviewed and are to be submitted as indicated in this RFP. Both qualifications and cost will be considered in the final ranking of firms with qualifications given 70% of the value of the weighted criteria and fees for the Cost Proposal given 30%. Respondent initiated email requests for clarification will be received any time on or before September 11, 2023 at 4:00PM via email to: stacy.tino@ahec.edu

Pre-Construction/Negotiated

Educational

$30,000,000.00

Public - City

Renovation

3

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
998
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2023

January 20, 2025

img_map_placeholder

900 10th St Plaza, Denver, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.