BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Topeka, Kansas. Completed plans call for site work for a water / sewer project.

BNR SCADA Development and Programming Last day for Comments or Request for Clarification: September 20, 2023 Contact information for Owner's Project Manager: Bill Perkins bperkins@wichita.gov o:316-268-4671 c:316-670-0087 The Project Goals related to the BNR SCADA Development and Programming include: o Ensure the safety of the public, City employees, the Project, and Facilities o Zero exceedances of regulatory limits due to control system errors o Develop and program a control system for the changes in processes at Plant 2 o Develop and program a control system for all of Plant 2 and related Plant 1 processes o Incorporate other sites and processes for access from the new programming o Keep, develop, and program a system with both cyber and physical security. The selected contractor shall provide development and programming services as required to design, integrate, and implement a SCADA system for control of systems at Wastewater Treatment Plants 2 and 1. This Project will include SCADA development and programming for work products delivered under Plant 2 Packages 2, 3, and 4 as well as Plant 1 and incorporation of existing infrastructure at Plant 2 and Plant 1. For this project the following assumptions may be incorporated,: all equipment installation and control panel fabrication by other projects; process control system hardware testing and staging by other projects; network device installation by other projects or City IT; Instrument configuration, calibration, and testing by other projects; full operational readiness of field equipment, including wiring troubleshooting and correction by other projects; and any offsite communications or remote communications hardware and configuration by other projects or City IT. The Contractor will coordinate with PEC and CDM Smith, multiple contractors working at Pant 2 and Plant 1, Garver, City Sewage Treatment Division, City IT Department, City PW&U Administration, and others as needed.

Post-Bid

Water / Sewer

$250,000.00

Public - City

Site Work

3

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
28
Bidding Soon
720
All Active Projects
277
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.