BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of an educational facility in Crookston, Minnesota. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for paving for a educational facility.

As of October 26,2023 the project was awarded to ; Dirt Dynamics LLC Knife River Material Pro Landscapers LL Century Fence Co. Molstad Excavating General Work and Labor 22 Mechanical 26 Electrical 31 Earthwork 32A Concrete Site Surfacing 32B Asphalt Paving 32C Landscaping 32D Site Fencing 33 Site Utilities Advertisement for bid does not include artificial turf materials and install, track surfacing and install, and grandstand/ pressbox and install. This was has been previously contracted. The Completion Date for the toilet room building and civil work is September 1, 2024. The completion date for the remainder of the project is October 1, 2024 . In no case will the deadline for project completion be extended. The Information to Bidders, Form of Bid, Form of Contract, Form of Bid Bond, and Form of Performance-Payment Bond, No bid will be read or considered which does not fully comply with the above provisions as to bond and licenses, and any deficient bid submitted will be resealed and returned to the bidder immediately. No bidder may withdraw his bid within 30 days after the actual date of the opening thereof. Each sealed bid shall be accompanied by bid security in the form of a certified check, cashiers check, or a bidders bond in a sum equal to five percent (5%) of the full amount of the bid made payable to the owner, executed by the bidder as principal and by a surety company authorized to do business in this state, conditioned that if the principal's bid be accepted and the contract awarded to the principal, within ten days after notice of award, the principal will execute and effect a contract in accordance with the terms of the bid and a contractors bond as required by law the regulations and determinations of the governing board. The Owner reserves the right to waive any informality or to reject any or all bids. Bid Result. Electrical: RBB Electric Inc. $749,200.00 Earthwork: Richards Excavating $1,200,500.00 Concrete Site Surfacing: Dirt Dynamics LLC $440,000.00 Asphalt Paving: Knife River Materials: $249,231.00 Landscaping: Pro Landscapers LLC $84,100.00 Site Fencing: Century Fence Co. $184,379.00 Site Utilities: Molstad Excavating $339,450.00

Award

Educational

$957,710.00

Public - City

Paving, Renovation, Site Work

22

25

13

5

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
14
Bidding Soon
106
All Active Projects
50
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2023

May 1, 2024

img_map_placeholder

402 Fisher Ave, Crookston, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.