EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 31, 2023 at 8:00 PM

Updated January 27, 2024

Site work and new construction of an educational facility in Morris, Minnesota. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The selected Respondent shall furnish and install a new ground mounted solar PV array near the existing array. The new array shall match the existing array and be provided with robust support beams and shall be mounted 8 feet off the ground. Provide pricing for the options listed below: o Base Option #1: 175 kW AC in power output o Alternate #A: Add an additional 105kW AC in power output o Alternate #B: 175 kW Heliene, Minnesota made solar modules o Need to know price difference between Base Option and Heliene panels o Alternate #C: Add additional 105 kW Heliene, Minnesota made solar modules o Need to know price difference between Alternate #A and Heliene panels The new array shall be located at the University of Minnesota, 600 East 4th Street, Morris, MN 56267 in the pasture south of Prairie Lane shown in the Figure E1. There is an existing 500kVA padmount transformer serving the existing array that is appropriately sized to support the new array. The existing padmount transformer, and both low and high voltage power lines are owned by the University of Minnesota Morris. No agreements are needed with the power company; the University will submit the interconnection application and the power purchase agreement is already in place. Respondent will need to work with the utility, Otter Tail Power Company, to acquire a production meter. Proposals shall include all ground work, structure and racking to mount the modules, all trenching and wiring to connect to the padmount transformer, connecting the new array to our monitoring system to be able to collect array output data via the internet and Modbus protocol (existing communications include point-to-point internet connection from the campus with an internet gateway that has additional capacity for connection to the new array), and securing permits from the University of Minnesota codes department including any engineering work needed to support the permits (i.e. civil, structural and electrical drawings). Proposals should also include upgrading the current overhead line fuses on the GOAB switch (currently rated at 140 A, but need 200 A for this addition) Construction Services for addition of a new solar array on the Morris campus. Question Deadline 09/19/2023 at 12:00 PM CT The University requires the Project to be substantially complete by no later than December 2, 2024. The total construction budget for this Project is $700,000 (current dollars, no escalation).

Award

Educational

$700,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 09 - Finishes

Division 09 - Finishes

Flooring, Terrazzo Flooring, Carpeting
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
7
Bidding Soon
107
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2023

October 13, 2023

img_map_placeholder

600 E 4th St, Morris, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.