BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Troy, Alabama. Completed plans call for site work for a water / sewer project.

General Scope of Work Includes: Mass grading, drainage, erosion control, utilities, weir walls, boulders, stream enhancement, landscape plantings, pedestrian bridges, bridge abutments, light installation and electrical work. Construction to begin the first week of June 2024. A cashiers check or bid bond payable to Troy University in an amount not less than five(5) percent of the amount of the bid, but in no event more than$10,000, must accompany the bidders proposal. Performance bond and evidence of insurance required in the bid documents will be required at the signing of the Contract. Bids must be submitted on proposal forms furnished in the project manual. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Owner. The bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in whichthe proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owners judgment, the best interests of the Owner will there by be promoted. The State of Alabama passed new legislation effective January 1, 2012 known as the Beason-Hammon Alabama Taxpayer and Citizen Protection Act,Act No. 2011-535. This legislation requires anyone receiving state monies to verify that they are in compliance with the new immigration law. AWARDED vendors must be able to prove compliance through the Federa lE-Verify process via Electronically. Work is to begin on or about issued Notice to Proceed and signed Construction Contract;270 calendar days. Actual schedule to be determined at pre-construction meeting scheduled after intent to award is given.

Post-Bid

Water / Sewer

$571,000.00

Public - City

Site Work

48

16

2

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
13
Bidding Soon
332
All Active Projects
136
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 20, 2024

img_map_placeholder

6 McKinley Dr, Troy, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.