EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Fleetwood, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of November 06, 2023, project was awarded to H&K Group Inc, awarded amount is $74,400.75. The Work to be performed consists of approximately 1,886 ton of 1.5 depth 9.5mm wearing course on Richmond Road, 815 ton of 3 depth 19mm wearing on Moll Road, and 3 mill in-place and compact, and 255 ton of 2 depth 9.5mm wearing course on Meadow Drive. Richmond Township intends to award a single street, or a combination of streets, based upon available funding. Each Proposal shall be accompanied by a Proposal Security equaling ten percent (10%) of the total amount of the Proposal. Work must be completed not more than thirty days (30) calendar days following receipt of the Notice to Proceed. Richmond Township reserves the right to accept or reject any or all Proposals or portions thereof. Bid Results : Richmond-Rd. : H&K Group : $ 191,750 Moll Road H&K Group : $ 74,401 Meadow Drive H&K Group : $ 33,339

Award

Roads / Highways

$74,401.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
167
Bidding Soon
2,169
All Active Projects
1,098
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2023

October 16, 2023

img_map_placeholder

Multiple Locations, Fleetwood, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Fall Roadwork Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.