Published January 9, 2024 at 7:00 PM

Updated October 1, 2024

Site work, paving and renovation of a mixed-use development in Montgomery, Texas. Conceptual plans call for the renovation of a water / sewer project; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Replacing approximately 420 LF of corroded 10" and 4" buried air piping at MCMUD 18's wastewater treatment plant with 460 LF of buried ductile iron air piping. Scope includes demolition and replacement of plant driveway, fence, and sidewalk to access buried airline. SUE services will be required to locate all existing utilities at the facility prior to installation of the proposed air piping. Temporary air bypass piping may be required.

Project Abandoned

Water / Sewer

$350,000.00

Public - County

Paving, Renovation, Site Work

7

16

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating, Painting
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Soil Mixing Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
59
Bidding Soon
2,325
All Active Projects
961
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2023

April 29, 2024

img_map_placeholder

Multiple Locations, Montgomery, TX


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Treatment Plant Blower Line Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.