BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2024 at 8:00 PM

Updated August 8, 2024

Site work and paving for a mixed-use development in Smithville, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

***Apparent low bid from previous bid opening: Julius Kaaz Construction Co. Inc. The proposed work includes: Construction of approximately 2,300 square yards of asphalt street replacement, 1,200 linear feet of concrete curb and gutter, 800 square yards of concrete sidewalk, 55 square yards of brick sidewalk, 500 linear of 15-inch through 18-inch storm sewer, 7 storm structures, 350 linear feet of 8-inch water line, 200 linear feet of 8-inch sanitary sewer, 17 street lights with base, traffic signs, landscaping, and all associated appurtenances. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE Goal for this project is 10%. There is no pre-bid conference scheduled for this project. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher. The City of Smithville reserves the right to reject any or all bids. The contractornquestionnaire must be on file 7 days prior to bid opening. MO DOT - Downtown Streetscape Construction Phase 3

Award

Roads / Highways

$1,696,100.00

Public - City

Paving, Site Work

38

20

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
68
Bidding Soon
1,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

August 19, 2024

Project location map

Multiple Locations, Smithville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.