BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2023 at 8:00 PM

Updated November 15, 2023

Renovation of a laboratory facility in Newport News, Virginia. Completed plans call for the renovation of a laboratory facility.

Shielding Blocks for Hall Bunkers Scope of Work Inclusions includes all labor, material, equipment and insurance to complete the following scope of work Shielding Blocks Furnish Rebar and concrete shop drawings for approval Furnish Plain Reinforcing Steel fabricated and bent to detail drawings Jefferson Lab reserves the right to randomly inspect the form work and rebar placement prior to Concrete pour to ensure that the structure is according to the Drawings. Install rebar as shown Install Lifting pads furnished by others Place and finish specified concrete Deliver Blocks to Jefferson Lab after cure for Unloading by others Any amendments or other information associated with the requirement will be posted electronically Small Business Set Aside: Yes Question Deadline 09/18/2023 at 5:00 PM ET. Questions regarding the solicitation must be submitted in writing will need time to respond to the questions and in turn provide you the opportunity to incorporate any new information into your proposals. Should you have any questions, please send an email to jessie@jlab.org or call me at 757-269- 7061. If I am not available, you may contact Mitch Laney (laney@jlab.org) at (757) 269-5338. It is JLab's intent to award a subcontract within 1-2 weeks after proposals are received (as soon as all proposals are evaluated and a supplier is selected). Please state on your business proposal that pricing is valid for at least (30) days. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office. Any proposal, modification, or revision received by J Lab after the designated time and date specified in the solicitation package is "late" and will not be considered unless the Procurement Officer determines that accepting the late offer would not unduly delay the acquisition. Subcontractor shall provide all labor, materials, facilities, equipment, and supervision to fabricate, inspect, and delivery of the Sheilding Blocks for Hall Bunkers per the Statement of Work. Please ensure to hold pricing for (30) days after RFQ Submittal.

Post-Bid

Laboratories

$18,000.00

Public - Federal

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
79
Bidding Soon
1,156
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2023

October 23, 2023

Project location map

12000 Jefferson Ave, Newport News, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.