Renovation of an educational facility in Ashburn, Virginia. Completed plans call for the renovation of a 5,500-square-foot educational facility.

Here are two firms which are qualified but unable to locate FHP. They are TMG Construction and FHP Construction. Question Deadline 09/28/2023 at 4:00 PM ET Contractor's Qualification Statement and Questionnaire To: Loudoun County Public Schools Division of Construction Services 960 Sycolin Road Se, Suite 110 Leesburg, Virginia 2 The Projects are generally comprised of, but not limited to, the following work: 1. These three (3) schools entry modification renovations each have differing scopes of work. These scopes of work may include, but are not limited to: 2. Main entry frame and door installations and modifications. 3 Interior vestibule frame and door installations and modifications. 4 Main office renovations. 5 Restroom relocations. 6 Lighting installations and modifications. 7 Security installations and modifications. 8 Communications and Data installations. 9 Lobby area renovations. 10 Fire Alarm system installations and modifications. 11 Fire Sprinkler system installations and modifications. 12 Electrical installations and modifications. 13 Interior Storefront installations and modifications. 14 Door Hardware installations and modifications. 15 Security System installation and modification. 16 Glass and Glazing installations and modifications. 17 Flooring installations and modifications. 18 Hazardous Materials Abatement; and 19 Ceiling installations and modifications 1.2.1. There are three (3) renovation projects associated with this prequalification. Project scopes for each of the sites are as follows: A. Aldie Elementary School: Approximately 1,200 SF of renovations; B. Lincoln Elementary School: Approximately 1,500 SF of renovations; and C. Hamilton Elementary School: Approximately 2,800 SF of renovations. 1.2.2. All three (3) projects are to be constructed concurrently during the timeline listed below. 1.2.3. Construction is anticipated to begin by June 20, 2024 1.2.4. Substantial Completion will be no later than August 9, 2024. 1.2.5. Final Completion will be no later than August 16, 2024. Incorporation of Laws and School Board Policies and Procedures. This RFQ is subject to the provisions of law and to LCPS Pre-qualification process, which are hereby expressly incorporated into this RFQ by reference. Applicants may review and inspect LCPS Pre-qualification process at the School Board's website electronically. The Owner requests that all hard copies be submitted bound only by a single staple or some other simple mechanical binding system. Three-ring notebooks should not be used

Bid Results

Educational

$300,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
71
Bidding Soon
1,936
All Active Projects
798
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2023

June 20, 2024

img_map_placeholder

Multiple Locations, Ashburn, VA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.