BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Fort Collins, Colorado. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000342685 Question Acceptance Deadline 03/01/2024 03:00 PM MT Questions are submitted online No, All questions should be submitted, in writing via email, to Pat Johnson, CPPB, Senior Buyer at pjohnson@fcgov.com, Fort Collins Utilities seeks to replace the roofs on the Chlorine Building, SPT Intermediate Lift Building, and Blower Building at DWRF. More detail regarding the project is in Section 00050 of the Bid Document. The Contract Documents provide for the construction of Bid 9943 Roof Replacements at Drake Water Reclamation Facility (DWRF). The roofs to be replaced include the Chlorine Building, Blower Building, and the South Process Train (SPT) Intermediate Lift Building. More detail regarding the project is in Section 00050. Work to begin Spring 2024, weather permitting Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required - Local Service Required - Warranty Information Required Bonding Requirements Buyer Requires E-Bonding - Bid Bond 5 % No Bid may be withdrawn within a period of ninety (90) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. 1. Demolition: a. Remove the existing roofing and insulation down to the metal deck and haul away the debris. b. All debris must be removed from the flutes of the metal deck before the new roof can be installed. 2. Installation. In advance of any Work, the Contractor will submit full specifications and manufacturer information for the products and systems proposed for use on City buildings. Installation shall consist of: a. Install one layer of 2" isocyanurate insulation mechanically attached with screws and plates. The attachment pattern shall be per 1-90 wind uplift requirements. b. Install one layer of 1/2" Dens-Deck Prime set in two-part urethane adhesive. The attachment pattern shall be the same as the tapered isocyanuiate. c. Install a 60 mil FleeceBack TPO Roof System set in two-part urethane adhesive. The attachment pattern shall be 4" on center throughout the entire roof area. The membrane shall be 115 mil total thickness with FleeceBack. Approved manufacturers: Carlisle, Firestone, GAF, Manville d. Provide additional insulation or other roofing materials as needed to construct positive slope to roof drains (2% slope (1/4"/ft)) e. Flash all walls and curbs with 60 mil FleeceBack TPO set in urethane adhesive. f. Install a termination bar at the top of the flashing at all wall locations. g. Install 24-gauge Stainless Steel Counter flashing over the top of the termination bar. h. All curbs shall be flashed with 24-gauge Stainless Steel Slip Flashing. i. Supply and install walkway pads. Locations to be determined by the owner. j. Provide and install new 24-gauge Stainless Steel vent stacks. k. Provide and install new cast iron drain screens at all roof drain locations. l. Material specifications are provided in Attachment B (Section 075303-Single Ply RoofingFully Adhered TPO 60 mil Reinforced). 3. Coordination: a. Owner will perform installation and plumbing of new roof drains (if applicable). Coordination will be needed with Owner during installation. b. DWRF project manager will coordinate the HVAC replacement at the Chlorine Building prior to installing the new roof.

Award

Water / Sewer

$120,800.00

Public - City

Renovation

3

20

13

13

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
67
Bidding Soon
906
All Active Projects
385
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2024

April 10, 2024

img_map_placeholder

3036 Environmental Dr, Fort Collins, CO

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.