BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Washington, Iowa. Completed plans call for the renovation of a residential development.

Owner: City of Washington 215 E Washington St Washington, IA 52353 Project Administrator: East Central Iowa Council of Governments 700 16th Street NE Suite 301 Cedar Rapids, Iowa 52402 Bid proposals are being accepted for the rehabilitation of residential structures. The East Central Iowa Council of Governments will receive sealed bids on Specifications and Bid Sheets for the exterior rehabilitation of owner-occupied homes. The bidding time frame is scheduled to allow bidders the opportunity to thoroughly inspect the project site. Bids shall be submitted in accordance with ECICOG's General Conditions and Bidding Procedures. The address, date and time of the bidding time frame is: ADDRESS: DATES: 424 E Washington Street Thursday, September 14th, 2023 Through Washington, IA 52353 Thursday, September 28th, 2023 ADDRESS: DATES: 1027 E 3rd Street Thursday, September 14th, 2023 Through Washington, IA 52353 Thursday, September 28th, 2023 Specific questions relating to the proposed work should be addressed to ECICOG. Mark Culver with ECICOG at 319-289-0061 can answer any questions you may have regarding the proposed work, payments and any other information relating to the work. Bids received after this date and time will not be accepted. Bids received will be awarded by ECICOG following bid tabulation and contractor verification. Bidders are required by law to be registered with the State of Iowa. Each bidder must have a completed contractor application form and proof of current insurance & Lead Safe Practices certification on file with ECICOG. Bids will be totaled on a lump sum and unit price basis and please round each line item to the nearest dollar amount. Housing inspector approves all change orders. A pre-construction meeting will be held within thirty (30) days of bid award. Work shall commence within fourteen (14) days following the notice to proceed and shall be completed within 90 days. Payments may be made to the contractor when line item work is completed. Retainage will be withheld from the progress payment in the amount of 10%. Payments will be made by the City of Washington. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced in the State of Iowa and to Iowa domestic labor to the extent lawfully required under Iowa statutes provided that award of contract will be made to lowest responsible bidder submitting lowest responsive bid, which shall be determined without regard to state or local law, whereby, preference is given to factors other than amount of bid. For questions concerning bid specifications, bid procedures, or open houses, please contact Mark Culver, ECICOG, Housing Inspector, at 319-319-289-0061. Section 3 language for procurement documents This language is to be included in all procurement documents/ solicitations) A. The work to be performed under this contract is subject to the requirements of section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (section 3). The purpose of section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing. B. The parties to this contract agree to comply with HUD's regulations in 24 CFR part 135, which implement section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other impediment that would prevent them from complying with the part 135 regulations. C. The contractor agrees to send to each labor organization or representative of workers with which the contractor has a collective bargaining agreement or other understanding, if any, a notice advising the labor organization or workers' representative of the contractor's commitments under this section 3 clause, and will post copies of the notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the section 3 preference, shall set forth minimum number and job titles subject to hire, availability of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin. D. The contractor agrees to include this section 3 clause in every subcontract subject to compliance with regulations in 24 CFR part 135, and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this section 3 clause, upon a finding that the subcontractor is in violation of the regulations in 24 CFR part 135. The contractor will not subcontract with any subcontractor where the contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24 CFR part 135. E. The contractor will certify that any vacant employment positions, including training positions, that are filled (1) after the contractor is selected but before the contract is executed, and (2) with persons other than those to whom the regulations of 24 CFR part 135 require employment opportunities to be directed, were not filled to circumvent the contractor's obligations under 24 CFR part 135. F. Noncompliance with HUD's regulations in 24 CFR part 135 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts. G. With respect to work performed in connection with section 3 covered Indian housing assistance, section 7(b) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450e) also applies to the work to be performed under this contract. Section 7(b) requires that to the greatest extent feasible (i) preference and opportunities for training and employment shall be given to Indians, and (ii) preference in the award of contracts and subcontracts shall be given to Indian organizations and Indian-owned Economic Enterprises. Parties to this contract that are subject to the provisions of section 3 and section 7(b) agree to comply with section 3 to the maximum extent feasible, but not in derogation of compliance with section 7(b). Section 3 Businesses are encourage to respond to this proposal. A Section 3 business is a business that is: 51% owned by Section 3 residents* Whose permanent, full-time staff is comprised of at least 30% Section 3 residents* Has committed 25% of the dollar amount of its subcontracts to Section 3 businesses *A Section 3 resident is defined as a public housing resident or someone with a household income that is less than 80% of the area median income. Businesses that believe they meet the Section 3 criteria are encouraged to register as a Section 3 Business through HUD's website.

Post-Bid

Residential Subdivision

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
36
Bidding Soon
847
All Active Projects
321
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 28, 2023

October 30, 2023

January 28, 2024

img_map_placeholder

Multiple Locations, Washington, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.