BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Spring Valley, Nevada. Completed plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

**As of November 30, 2023, this project has not yet been awarded. The project is expected to be awarded until after the new year.** Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. The work to be performed under this Contract is for a new Peace Way Bridge at Clark County 215 Beltway and roadway improvements along Peace Way from Hualapai Way to Cimarron Road. Construction shall include a two-span precast concrete girder bridge carrying Peace Way over CC215. Roadway improvements to include rehabilitate or reconstruct Peace Way roadway, cold planing, plantmix bituminous surface and base, UTACS, new curb and gutter, curb and gutter reconstruction, sidewalk, sidewalk reconstruction, sidewalk ramps, sidewalk ramp reconstruction, median construction, concrete barrier rail, utility adjustments, LED street lights for bridge and parcels receiving curb and gutters, underdeck lights on bridge, chain link fence, Intelligent Traffic System (ITS) conduit, upgrade/replace all signage; school flashing beacon modification, traffic control devices, traffic signal modifications, impact attenuator, and pavement markings along with associated traffic control and dust control. This work also includes thin bonded multilayer overlay of existing bridge deck of the Fort Apache bridge over CC215. Question Deadline 11/7/2023 08:30 PM (ET) Should you have any questions, please contact at (702) 455-4441 or scott.jones@clarkcoiiritvnv.gov. ESTIMATED COST: $21,050,474 - $23,266,314.

Award

Bridges / Tunnels

$19,800,000.00

Public - County

Outdoor Lighting, Paving, Site Work

140

25

23

7

Subscribe For Documents

98 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
15
Bidding Soon
388
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2023

January 15, 2024

img_map_placeholder

Peace Way, Spring Valley, NV


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.