BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in Hoopa, California. Completed plans call for the construction of a 6,600-square-foot educational facility; and for site work for a educational facility.

Any questions related to this RFP shall be submitted to the attention of Pamela Mattz, Planner II, via email at hvtplanner@gmail.com. Questions shall be submitted before Friday, September 22, 2023, at 5:00 PM. in order to address the questions in a timely manner. No oral questions or inquiries about this RFP shall be accepted. The Hoopa Valley Tribe (HVT) is requesting proposals (RFP) from responsible and responsive qualified individuals, organizations, or companies for the "Project & Construction Manager" position for a new 6,600 square foot education building, site work and utilities, known as the "New K-12 Education Building Project." With a contract estimated performance period of the date of contract approval by the Hoopa Valley Tribe (HVT) to the targeted Project completion end date of 3 years. The proposals submitted in response to the RFP will be used as a basis for selecting the "Project & Construction Manager consultant for this project. The Consultant's proposal will be evaluated and ranked according to the criteria provided in Appendix B, "Evaluation Criteria," of the "RFP-Comprehensive." Addenda to this RFP, if issued, will be sent to all prospective Consultants the Hoopa Valley Tribe's Planning Department has specifically e-mailed or mailed a copy of the "RFP Comprehensive" to, and are placed on the Project's "Plan Holder's List." Proposals shall be submitted in a sealed package clearly marked "Hoopa Valley Tribal Education Department," "New K-12 Education Building Project," "Project & Construction Manager Proposal" "Do Not Open," and shall be addressed as follows: Onaleece Colegrove, Director Hoopa Valley Tribal Education Department P.O. Box 1348 11860 State Highway 96 Hoopa, CA 95546 (530) 625-4413 x29 Contract Award & Notice to Proceed: Friday, October 6, 2023. Indian Preference, Section 7(b) of the Indian Self-Determination & Education Assistance Act (25 USC 450e(b)), and the Hoopa Valley Tribe's TERO Ordinance, as amended, will be enforced. Contractor and employees shall be subject to the Drug and Alcohol Policies Ordinance, Title 21 of the Hoopa Valley Tribal Code.

Award

Educational

$197,633.00

Public - Federal

New Construction, Site Work

8

5

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
3
Bidding Soon
77
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2023

October 6, 2023

img_map_placeholder

421 Loop Rd, Hoopa, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.