BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2025 at 8:00 PM

Updated October 23, 2025

Site work for a mixed-use development in Hoopa, California. Completed plans call for site work for a service station / car wash facility; and sidewalk / parking lot.

The Yurok Tribe (the "Tribe") is seeking a contractor to design and build an EV Charging Station Installation project located in Tulley Creek, Humboldt County, CA, 95546. Technical questions or requests for clarification shall be directed, in writing, to the email address below. The Tribe's responses to a proposer's question(s) will be provided via return email only to the proposer asking the question(s) and not shared with other respondents. 07/24/25 - 08/21/25 Questions and Answer Period 08/28/25 Selection completed/contract negotiations begin The Tribe reserves the right to reject any or all responses to this RFP, to waive minor irregularities in any proposal or in the RFP procedures, and to accept any proposal presented which meets or exceeds these specifications and which is deemed to be in the best interests of the Tribe. However, the requirements for timelines shall not be waived. The successful team will be required to furnish Bid bonds totaling no less than 5% of the total bid and payable to the Owner shall accompany any bid. The successful team will be required to furnish Performance, and Payment bonds in the amount of 100% of the total contract price before construction. Technical questions or requests for clarification shall be directed, in writing, to the email address below. The Tribe's responses to a proposer's question(s) will be provided via return email only to the proposer asking the question(s) and not shared with other respondents. The Yurok Tribe Transportation Department is seeking a contractor to design and install two Level Three and one Level Two EV Charging Station, located at Tulley Creek, Weitchpec, Humboldt County, CA. Contractor will develop design plans to establish the precise parameters of the project, estimate final construction costs based on final designs, and secure approval for construction. SCOPE OF WORK: SITE ASSESSMENT: Conduct a design kickoff meeting and provide meeting agenda and minutes. Conduct preliminary site engineering including records research, field review, and lady survey. Coordinate with local utilities. Develop a set of 30% design plans for review and comment. Develop and provide a set of 100% design plans and specifications that include: Schematics and Wiring Diagrams Bill of Materials Construction Schedule Operations and Maintenance Manuals Training Materials Compile a bill of materials specifying all necessary components and materials for the installation. Develop construction schedules and project timelines to coordinate installation activities and ensure timely completion. Coordinate with third parties such as PG&E, to oversee the construction process and ensure compliance with design plans and regulatory requirements.

Post-Bid

Sidewalks / Parking Lot

$310,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
11
Bidding Soon
133
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

February 23, 2026

Project location map

Tulley Creek,, Hoopa, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.