Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Site work for a civil project in Watsonville, California. Conceptual plans call for site work for a water / sewer project.

This project is for the Reach 6 levee and floodwall construction along the Corralitos Creek, a tributary of the Pajaro River Levee System in the City of Watsonville, County of Santa Cruz. The Project consisting of 2.6 miles of flood risk management levees with approximately 111,600 compacted cubic yards (cy) of fill, and 1,500 ft of floodwalls. The Pajaro FRM Project consists of from Reach 2 to Reach 6 of the Pajaro flood control system. This 1TB is for Reach 6 of the Pajaro FRM Project. The project area is located within the lower Pajaro River watershed. It encompasses an area of approximately 10,000 acres, which includes the stream channels, active floodplains, and terraces along the Pajaro River and the Salsipuedes and Corralitos Creeks. The area is divided by the Pajaro River, which serves as a border for two counties. Santa Cruz County lies to the north of the Pajaro River, and Monterey County lies to the south. The Salsipuedes and Corralitos Creeks, which join just north of the Pajaro River in Santa Cruz County, are tributaries of the Pajaro River. The engineered levees have a crest elevation of ranging from 2 to 8 feet, a minimum crest width of 20 feet, and 3H:1V side slopes. The access road, on top of the levee, will be surfaced with a minimum of 8 inches of CalTrans Class 2 Aggregate Base. Structural features included in the contract include 1,500 LF of 6 ft to 9 ft high floodwall walls. The Highway 152 Bridge will be raised approximately 6 ft and it is a separate project. The first 100 ft from boarding the bridge are left for future construction with the bridge. Construction for Reach 6 is likely to be performed across the at two construction seasons. See Attachment 1 for Site Map. There are two side channels designed to enhance eco-system restoration in the Project. The material excavated from the channels is not suitable to be used for the engineered levee along. Suited soil will be imported offsite to blend with the excavated soil for levee fill. The site has limited access. Some of the ingress/egress are through unpaved dirt roads in farm fields. Attachment 2 shows permanent easements, staging area and hauling routes. Material from excavation will be stockpiled and mixed with imported soil onsite. REQUEST INPUT: The Government seeks input from interested companies to better understand socio-economic capability, inform participation, and address engineering, acquisition considerations. If your company is interested in this project, please submit a response to include the following information: 1. Company Name 2. Company Point of Contact 3. Company Size 4. Company Experience 5. Company Bonding Limit Please submit no more than 2 projects for your experience (similar in scope, complexity, and magnitude of this project), within the last 10 years, indicating your company's role in the execution of the work (prime or subcontractor). The information provided by your company will not be disclosed without your prior consent. Please answer the following questions in your submission: 1. What challenges (reservations) do you have about this project 2. The Government contemplates utilizing a lump sum or job pricing approach for the work and does not plan to include a line item for the estimated quantity and cost per cubic yard of fill. Given this approach, what are your concerns, if any Please submit your responses no later than April 21, 2025 3:00 PM PST. Limit submissions to 10 pages. All interested companies must be registered in the System for Award (SAM) to be eligible for a federal contract award. Please email responses to logan.champlin@usace.army.mil. Please send your responses via email, and use subject line: "Sources Sought Response to W912P725S0007 - Pajaro River FRM Reach 6''. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Water / Sewer

$75,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
5
Bidding Soon
1,305
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

Project location map

To Be Determined, Watsonville, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.