BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a military facility in North Wilkesboro, North Carolina. Completed plans call for the addition of a 1,451-square-foot military facility; for the demolition of a military facility; for site work for a military facility; and for the renovation of a 12,719-square-foot military facility.

As of January 22, 2024, construction of this project has commenced and is expected to be completed by January, 2025. No further inquiries to be accepted. This project consists of the renovation (12,719sf) and addition (base bid 1,451sf, alternate 1,476sf) to the existing National Guard Readiness Center in North Wilkesboro, NC original drawings dated November 1952, renovation (4,422sf) and addition (428sf) to the Unit Training Bay (UTB) and construction (1,936sf) of the Unheated Storage Building (USB). The scope consists of building renovations, additions, new construction including new plumbing, mechanical, electrical, fire alarm, communications, and finishes throughout. The existing buildings are masonry load-bearing construction with steel and concrete framing/structure and deck. All hazardous materials such as asbestos and lead shall be removed as part of the scope. The scope also includes a complete reroof, window repair, resinous flooring, lay-in ceiling replacement, interior and exterior door replacement, and painting throughout. Electrical scope consists of complete electrical service replacement, generator, new LED light fixtures, fire alarm replacement, and network wiring replacement. The building additions and new construction are primarily masonry load-bearing construction with brick veneer, steel roof framing and deck. Site work for the project consists of parking lot expansion and paving for private and military vehicles, sidewalk replacement, new fencing, and new water, sewer, electrical, gas, and communications service to the building. The project includes all other work as shown, indicated, or reasonably implied on the drawings and/or specifications for a complete, first-class job. Last day for Questions will be Friday, September 22, 2023 by 5:00 pm. The Last Addendum will be issued Tuesday, September 26, 2023 by 12:00 pm. Date of substantial completion: 420 consecutive calendar days from anticipated Notice to Proceed. *This project has been awarded and all trades have been let.

Under Construction

Military

$9,510,200.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

220

39

28

8

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
47
Bidding Soon
958
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2023

January 22, 2024

img_map_placeholder

191 Armory Rd, North Wilkesboro, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.