Site work and renovation of a civil project in Lexington, South Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Bids received- Selection underway Bids are invited upon the several items and quantities of work as follows: Decommissioning and demolition of the existing Watergate WWTP; Abandonment of portions of the existing Watergate WWTP influent 6-inch force main and effluent 6-inch force main; Replacement of submersible pumps at Spence's Point Pump Station; Construction of a replacement of the Watergate Lower Pump Station. The pump station includes gravity sewer tie-in, site work, a duplex submersible pump station, and associated piping, electrical, equipment, and appurtenances; Construction of 900-ft of proposed 6-inch sewer force main; Construction of the proposed Old Chapin Regional Pump Station. The pump station includes a paved access road, site work including two retaining walls, a triplex submersible pump station with diesel generator and electrical building, and associated piping, electrical, equipment, and appurtenances. No bid shall be considered unless the bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law and has a classification of General Contractor-Public Utilities and a sub classification of Water and Sewer Lines with the appropriate License Group Limitation for the Bid amount. A certified check or bank draft payable to the order of the OWNER, negotiable U. S. Government Bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable Surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project as applicable. Any inquiry received before the close of business on Friday, October 6th, 2023 shall be given consideration. Every interpretation made to a Bidder will be in the form of an Addendum to the Contract Documents, and when issued, shall be on file with the office of the Owner and the office of the Enginee

Bid Results

Water / Sewer

$7,967,725.00

Public - City

Renovation, Site Work

60

17

2

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Foodservice Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Facility Fuel Systems, Facility Fuel Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Mowing, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Site Improvements, Fences and Gates, Irrigation, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Sanitary Sewerage Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
93
Bidding Soon
891
All Active Projects
414
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2023

December 11, 2023

img_map_placeholder

Multiple Locations, Lexington, SC


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Watergate Wastewater System Improvements - Division "B"

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.