BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Shoreview, Minnesota. Conceptual plans call for the renovation of a clubhouse / community center.

A repair and replacement allowance for the pool and locker room areas at the Community Center. Planned costs are listed below: Pool/Whirlpool replacement costs include: 2024 - $15,000 replace sand in tropics pool filters 2025- $15,000 replace main pool heater 2025 - $10,000 bamboo bay defender filter maintenance 2026 - $15,000 replace Bamboo Bay pool heater 2026 - $15,000 refurbish pool floatable 2027- $ 20,000 replace pool floatable Locker Room replacements include: 2024 - $ 225,000 replace lockers in pool locker rooms 2028 - $50,000 replace/repair life flooring allowance 2029 - $50,000 replace/repair life flooring allowance Waterslide repair/replacement costs include: 2025 -$ 15,000 refurbish Bamboo Bay waterslide 2025 - $15,000 refurbish Tropics waterslide 2028 - $25,000 refurbish bamboo bay structure 2029 - $15,000 replace bamboo bay yellow slides Repair/Replacement costs Include: 2024 - $20,000 bamboo bay replacement shallow water play features 2024 - $35,000 update old electrical panels and conduit in tropics pump room 2025 - $ 105,000 replace Kalwall in Tropics 2026 - $50,000 refurbish sound & light system on water slide 2026 - $30,000 replace furniture in pool areas 2026 - $15,000 replace basketball hoop along pool edge 2029 - $120,000 replace pirate ship slide feature This project is included in the city’s 2023-2029 Capital Improvement Plan. As of March 18, 2024, project funded for FY2024-2029. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Clubhouse / Community Centers

$860,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
83
Bidding Soon
800
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.