BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Central, South Carolina. Completed plans call for site work for a swimming pool.

The Central Clemson Indoor Recreation Center is requesting sealed proposals from qualified firms or individuals for lap and small pool re-plastering. Question Deadline 09/25/2023 at 5:00 PM ET SPECIFICATIONS/SCOPE OF WORK The successful Proposer shall provide the following: Small Pool o Remove and replace (2) 12" band of black 2"x2" racing lanes and wall targets. o Clean existing plaster surface, acid wash and pressure wash with turbo tip, prior to bond coat application. Existing plaster surface may require water blasting to support bonding agent. o Cut and chip plaster beneath waterline tile, to create spacing for new plaster application. o Saw cut and chip away existing plaster around all return lines, rope anchors for a better transition of new plaster. o Sound out existing plaster. Beat up and remove loose plaster. o Apply a bond coat, Muticoat Products', Scratch Kote 2000 to ensure that new plaster will adhere to existing plaster. o Supply and install one row of 2" x 2" black tile trim on steps and benches. o Supply and install (2) new 12" main drain frame and grates for main drains, (3) 8" frame and grate for EQ lines under skimmers. Supply and install (23) 1 1/2 " screw on eyeball return fittings for return lines. o Apply approx. 3/8" to 1/2 " average, white plaster, trowelled to a hard smooth finish. o Remove and replace waterline tile around pool, including depth markers and International NO DIVING tiles. Apply a taped and tooled polyurethane between new tile and existing coping. Lap Pool o Remove and replace (6) 12" band of black 2"x2" racing lanes and wall targets. o Clean existing plaster surface, acid wash and pressure wash with turbo tip, prior to bond coat application. Existing plaster surface may require water blasting to support bonding agent. o Cut and chip plaster beneath waterline tile, to create spacing for new plaster application. o Saw cut and chip away existing plaster around all return lines, rope anchors, and wall steps for a better transition of new plaster. o Sound out existing plaster. Beat up and remove loose plaster. o Apply a bond coat, Muticoat Products', Scratch Kote 2000 to ensure that new plaster will adhere to existing plaster. o Supply and set two rows of black 2"x2" belly band across middle of pool, to differentiate shallow end and deep end. o Supply and install (2) new 12" main drain frame and grates for main drains, (9) 8" frame and grate for EQ lines under skimmers. Supply and install (28) 1 1/2 " screw on eyeball return fittings for return lines. Repair pool light covers. o Apply approx. 3/8" to 1/2 " average, white plaster, trowelled to a hard smooth finish. o Remove and replace waterline tile around pool, including depth markers and International NO DIVING tiles. Apply a taped and tooled polyurethane between new tile and existing coping Proposer shall provide an itemized pricing schedule that includes the following: o Removal and replacement

Post-Bid

Swimming Pools

$170,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
49
Bidding Soon
820
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2023

October 18, 2023

img_map_placeholder

130 Commons Way, Central, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.