BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2024 at 7:00 PM

Updated January 27, 2024

Renovation of an educational facility in Snellville, Georgia. Completed plans call for the renovation of a educational facility.

As of January 10, 2024, bids are still under evaluation. Contract, if awarded, will be on a stipulated sum basis for the project listed above. No bids may be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by a bid bond payable to Gwinnett County Board of Education, in the amount equal to five percent (5%) of the base bid, (certified checks are NOT acceptable). Performance Bond, and Labor and Material Payment Bond, each in amounts equal to 100% of the Contract Sum, will be required of the successful bidder. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia be listed on the "Department of Treasury" Circular 570, and have an A. M. Best Company rating of minimum Class "A" , with financial size VI or better. A Payment Bond and a Performance Bond, in the amount 100% of the value of the respective subcontractor's work, will be required of the Fire Proofing, Mechanical/HVAC, Plumbing, Sprinkler, Electrical, and Roofing Subcontractors. Submit all questions about the Drawings and Specifications to the Architect, in writing. Replies will be issued to all bidders of record as Addenda to the Drawings and Specifications and will become part of the Contract. The Architect and Owner will not be responsible for oral clarifications. Bidders are required to be licensed General Contractors. All bidders must be licensed in the State of Georgia and furnish to the Architect a completed Contract's Qualification Statement (AIA Document A305) to be evaluated by Owner and Architect prior to obtaining bidding documents. Plans and Specifications will not be released prior to approval. The Owner reserves the right to disqualify bids, before or after opening, upon evidence of collusion with intent to defraud or other illegal practices upon the part of the bidder. Owner reserves the right to disqualify bids submitted without bid security. A written Notice to Proceed will be issued after the Pre-Construction Conference upon acceptance and approval of all Contracts, Bonds, Insurance, etc. Contractor shall mobilize within ten (10) days of the date of the written Notice to Proceed. The start date for the work will be May 23, 2024. All work outlined in the Contract Documents must be substantially complete by July 19, 2024.

Post-Bid

Educational

$500,000.00

Public - County

Renovation

25

12

17

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
171
Bidding Soon
2,327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2023

May 23, 2024

Project location map

3115 Centerville Ln SW, Snellville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.